Laserfiche WebLink
EXHIBIT 4 <br />COST ANALYSIS <br />CONSTRUCTION OF PROJECT NO. 11-6413: SA-5 Vault Modifications <br />Construction Contract <br />$ <br />1,528,500.00 <br />Contract Administration, Inspection and Testing <br />$ <br />259,275.00 <br />Contingencies <br />$ <br />469,275.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />2,257,050.00 <br />