Laserfiche WebLink
EXHIBIT 5 <br />PROJECT TITLE: <br />SA-5 Vault Relocation <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br />Municipal Facilities <br />LOCATION MAP <br />A <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />City water connection with Metropolitan Water District to be relocated and <br />improved with new piping, vault and control system. <br />F <br />OJECT NEED: <br />existing vault is in need of repair and floods, damaging existing piping, <br />mentation and valuing. <br />.==A aw <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 2,257,050 - - - - - - <br />TOTAL 2,257,050 - - <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />WATER CAPITAL 2,257,050 - - - - - - <br />TOTAL 2,257,050 - - - - <br />AGENCY: DIVISION: CONTACT: DATE: <br />Public Works Design Engineering Armando Fernandez, Principal Civil Engineer 06-May-2024 <br />pr I <br />I" <br />