Laserfiche WebLink
Installation of 36" Butterfly valves cut into 32" RCP Trunk line. <br />Shawnele Morelos, P.E., QSD/P <br />Principal Engineer — Capital Projects <br />Elsinore Valley Municipal Water District <br />Office: 951-674-3146 Ext. 8320 <br />Cell: 760-522-9927 <br />31315 Chaney Street, Lake Elsinore, CA 92530 <br />Ortega Highway Water main replacement Project (2020) <br />EVMWD <br />6 months ($400,000) <br />Installation of 2000 LF of 8" C-900 pipeline, valves, fittings, Backflows, fire hydrants and air <br />vacs. Abandonment of 4" steel main, welding of closed ends. Grading of roadway disturbed. <br />Paving and striping to restore original conditions. <br />Shawnele Morales Lead Engineer. <br />Utilities Installation for Elsinore High School (2019) <br />Lake Elsinore Unified School District <br />6 months ($100,000) <br />Installation of new 12" C-900 water line, valves and tie ins. Installation of 6" SDR-35 Sewer <br />main. Installation of 2 - 4' Diameter manholes with pour in place bottoms. Site grading and <br />paving. Concrete sidewalk and curb and gutter repair. <br />Octavio Nava (323) 213-0887 <br />Onava(a)_telacu.com <br />Rosalie Ave and Caroline Ct water line replacement CIP (2023-current) <br />Lake Hemet Municipal Water District (LHMWD) <br />3 months ($250,000) <br />Installation of 8" C-900 waterline. Approximately 800 LF of new line, 4- Firehydrants, 1 air vac, <br />24 services, and valves. Concrete work and AC paving to finish. <br />Jason Venable (951) 658-3241 <br />Jvenablep_lhmwd.org <br />Service Contract City of Seal Beach <br />1 year <br />