My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:13:08 PM
Creation date
5/16/2024 11:38:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Garrett Lee Rowan (City of Seal Beach) <br />(562) 447-9640 <br />City of Lake Elsinore Service Contract <br />3 year (with 3 year renewal) <br />Service and repair of the concrete PRW's. Abandonment of services. Emergency clearing and <br />grubbing. <br />Gus Papagalos City Consultant <br />(951) 764-2417 <br />Goapagolos<a)verizon. net <br />Pier G Water Line Project (General WE O'neil) (2015) <br />1 year project <br />Installation of Domestic and Reclaimed Underground Waterlines to supply Pier with water. <br />Installation of 120" storm drain to new facility inlet. Skill sets included heavy equipment, pipe <br />fitting, grading, export/import and concrete civil work. <br />29 Palms Landfill Project (General ERRG) (2015) <br />6 months <br />Installation of New Base Landfill. Skill sets included but not limited to heavy civil work and <br />electrical distribution systems for monitoring station. <br />Warren Oil Field Catch Basin Project (General SGI) (2016) <br />2 years <br />Installation of 35' deep oil refinery catch basin. Skill sets include heavy civil work and onsite <br />safety and health standards regulated by BP fuels. <br />Brian Muiter (Field Supervisor) <br />(951) 219-8043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.