My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:13:08 PM
Creation date
5/16/2024 11:38:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Huntington Beach City Water Meter Replacement and Edison Line Extension Project <br />(Sub J & L) (2016) <br />3 months ($200,000) <br />Installation of over 10 new Edison line extensions for panel upgrades. Skill sets included <br />trenching, civil, electrical, and utility avoidance plans. Installation of water and sewer laterals as <br />well for multiple housing developments. <br />Ruben Chase (Prime Chase Construction) <br />(714) 914-6346 <br />TransPak Fireline Repair Project (General J & L) (2016) <br />8 months <br />Installation and repair of primary 18" fireline to industrial park. Skill sets included civil, <br />mechanical, heavy equipment and import/export backfill. Along with asphalt paving and <br />concrete paving. <br />Balboa Bay Beach Club Transformer Upgrades Project (Sub J & L) (2017) <br />3 months ($100,000) <br />Installation of Primary and Secondary Edison feeds to docks B, C, and D. Skill sets included, <br />electrical, civil, underground structures, and OSHA deep trench shoring. Dewatering as well. <br />Mike King (714) 767-6453 <br />King Electric <br />Balboa Bay Beach Club Prime Electrician <br />Outlets at San Clemente Tesla Supercharger Project (General Potential Electrical) (2017) <br />2 months ($200,000) <br />Installation of 21 Tesla Charging Stations. Skill sets included civil, electrical, pipe fitting, <br />equipment installation, utility avoidance, import/export and concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.