Laserfiche WebLink
Huntington Beach City Water Meter Replacement and Edison Line Extension Project <br />(Sub J & L) (2016) <br />3 months ($200,000) <br />Installation of over 10 new Edison line extensions for panel upgrades. Skill sets included <br />trenching, civil, electrical, and utility avoidance plans. Installation of water and sewer laterals as <br />well for multiple housing developments. <br />Ruben Chase (Prime Chase Construction) <br />(714) 914-6346 <br />TransPak Fireline Repair Project (General J & L) (2016) <br />8 months <br />Installation and repair of primary 18" fireline to industrial park. Skill sets included civil, <br />mechanical, heavy equipment and import/export backfill. Along with asphalt paving and <br />concrete paving. <br />Balboa Bay Beach Club Transformer Upgrades Project (Sub J & L) (2017) <br />3 months ($100,000) <br />Installation of Primary and Secondary Edison feeds to docks B, C, and D. Skill sets included, <br />electrical, civil, underground structures, and OSHA deep trench shoring. Dewatering as well. <br />Mike King (714) 767-6453 <br />King Electric <br />Balboa Bay Beach Club Prime Electrician <br />Outlets at San Clemente Tesla Supercharger Project (General Potential Electrical) (2017) <br />2 months ($200,000) <br />Installation of 21 Tesla Charging Stations. Skill sets included civil, electrical, pipe fitting, <br />equipment installation, utility avoidance, import/export and concrete. <br />