Laserfiche WebLink
Sample Task Order B Items of Work <br />Item No. 1 - Unclassified Excavation <br />Payment for Unclassified Excavation shall be at the contract unit price per Cubic Yard listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. <br />Payment for unclassified fill, if any, is considered as included in the unit price paid for <br />unclassified excavation. <br />Payment for over -excavation shall be paid for at the unit price for unclassified excavation. <br />Item No. 2 - PCC Sidewalk (T=4") <br />The work under this item consists of grading, compacting subgrade, and constructing 4-inch <br />thick PCC Sidewalk shall be in accordance with the provisions of Section 301-1, "Subgrade <br />Preparation," and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross Gutters, Alley <br />Intersections, Access Ramps, and Driveways," of the Standard Specifications, plans, and contract <br />document specifications. <br />Payment for PCC Sidewalk (T=4") shall be at the contract unit price bid per Square Foot as <br />listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br />compensation will be allowed therefore. Payment for thickness (T=6") shall be paid 1.5 times the <br />unit price. <br />Item No. 3 - PCC Curb Ramp <br />The work under this item consists of saw -cutting, removing, grading, compacting subgrade, <br />constructing 12" wide by 12" deep AC Hot Mix on compacted subgrade, and constructing PCC <br />Curb & Gutter and shall be in accordance with the provisions of Section 301-1, "Subgrade <br />Preparation," and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross Gutters, Alley <br />Intersections, Access Ramps, and Driveways" and any City Standard Specifications, plans, <br />and/or any City's Special Provisions/Contract Documents provided by the City for each Task <br />Order. <br />Payment for PCC Curb Ramp shall be at the contract unit price bid per Square Foot as listed in <br />the Fee Proposal, and shall include full compensation for doing all work, including furnishing all <br />materials, labor, equipment, tools, and incidentals as required and no additional compensation <br />will be allowed therefore. The area included in this bid item shall be measured from the gutter lip <br />to the back of walk, from BCR to ECR. <br />Item No. 4 - PCC Curb & Gutter (A-2-8) <br />City of Santa Ana RFP 23-182 <br />Page Al-8 <br />