Laserfiche WebLink
The work under this item consists of grading, compacting subgrade, constructing 12" wide by <br />12" deep AC Hot Mix on compacted subgrade, and constructing PCC Curb & Gutter (outside of <br />the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section <br />301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross <br />Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard <br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the <br />City for each Task Order. <br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot <br />as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Item No. 5- Furnish and Install New #6 Pull Box <br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with <br />the latest CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents to be provided for each Task Order Work. The assumed <br />material for placement shall be concrete and any removal of an existing pull box shall be <br />included in the price paid to furnish and install a new pull box and no additional payment will be <br />allowed therefore. <br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per <br />Each as listed in the Fee Proposal, and shall include full compensation for doing all work, <br />including furnishing all materials, labor, equipment, tools, and incidentals as required and no <br />additional compensation will be allowed therefore. <br />Item No. 6 - Adjust Manhole to Finished Grade <br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each <br />as listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional <br />compensation will be allowed therefore. <br />Item No. 7- Catch Basin (Type `B," W=10') <br />The work under this item consists of grading, compacting subgrade, and constructing Catch <br />Basin and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation," <br />and Section 303-1, "Concrete Structures" and any City Standard Specifications, plans, and/or <br />any City's Special Provisions/Contract Documents provided by the City for each Task Order. <br />Payment for Catch Basin (Type `B," W=10') shall be at the contract unit price paid per Each as <br />listed in the Fee Proposal, and shall include full compensation for doing all work, including <br />removal or replacement of existing catch basins and/or other appurtenances, including furnishing <br />all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin, <br />soil preparation and compaction, and no additional compensation will be allowed therefore. <br />City of Santa Ana RFP 23-182 <br />Page Al-9 <br />