The work under this item consists of grading, compacting subgrade, constructing 12" wide by
<br />12" deep AC Hot Mix on compacted subgrade, and constructing PCC Curb & Gutter (outside of
<br />the curb ramp footprint, beyond the BCR or ECR) in accordance with the provisions of Section
<br />301-1, "Subgrade Preparation," and Section 303-5, "Concrete Curbs, Walks, Gutters, Cross
<br />Gutters, Alley Intersections, Access Ramps, and Driveways" and any City Standard
<br />Specifications, plans, and/or any City's Special Provisions/Contract Documents provided by the
<br />City for each Task Order.
<br />Payment for PCC Curb & Gutter (A-2-8) shall be at the contract unit price bid per Linear Foot
<br />as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional
<br />compensation will be allowed therefore.
<br />Item No. 5- Furnish and Install New #6 Pull Box
<br />The work under this item for Furnish and Install New #6 Pull Box shall be in accordance with
<br />the latest CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's
<br />Special Provisions/Contract Documents to be provided for each Task Order Work. The assumed
<br />material for placement shall be concrete and any removal of an existing pull box shall be
<br />included in the price paid to furnish and install a new pull box and no additional payment will be
<br />allowed therefore.
<br />Payment for Furnish and Install New #6 Pull Box shall be at the contract unit price paid per
<br />Each as listed in the Fee Proposal, and shall include full compensation for doing all work,
<br />including furnishing all materials, labor, equipment, tools, and incidentals as required and no
<br />additional compensation will be allowed therefore.
<br />Item No. 6 - Adjust Manhole to Finished Grade
<br />Payment for Adjust Manhole to Finished Grade shall be at the contract unit price bid per Each
<br />as listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />furnishing all materials, labor, equipment, tools, and incidentals as required and no additional
<br />compensation will be allowed therefore.
<br />Item No. 7- Catch Basin (Type `B," W=10')
<br />The work under this item consists of grading, compacting subgrade, and constructing Catch
<br />Basin and shall be in accordance with the provisions of Section 301-1, "Subgrade Preparation,"
<br />and Section 303-1, "Concrete Structures" and any City Standard Specifications, plans, and/or
<br />any City's Special Provisions/Contract Documents provided by the City for each Task Order.
<br />Payment for Catch Basin (Type `B," W=10') shall be at the contract unit price paid per Each as
<br />listed in the Fee Proposal, and shall include full compensation for doing all work, including
<br />removal or replacement of existing catch basins and/or other appurtenances, including furnishing
<br />all materials, labor, equipment, tools, and incidentals as required to construct a new catch basin,
<br />soil preparation and compaction, and no additional compensation will be allowed therefore.