The unit price for each Install Electrical Meter Pedestal shall be considered full compensation for
<br />furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation
<br />repair, root shaving, sidewalk restoration, and appurtenances for all related items of work
<br />necessary for the installation. No additional compensation will be allowed therefore.
<br />Item No. 5 — Install 211 PVC Conduit
<br />This work consists of furnishing and installing Polyvinylchloride (PVC) street lighting conduit
<br />including pull tape, ground wire, fittings, duct seal, utility potholing, concrete or asphalt
<br />restoration and appurtenances complete and in place, of the size indicated on the plans.
<br />The unit price bid per linear foot of PVC Conduit shall be considered full compensation for
<br />furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation
<br />repair, root shaving, sidewalk restoration, pothole and/or trench backfill per City Std. Plan 1150,
<br />permanent asphalt replacement, permanent PCC replacement, striping and appurtenances for all
<br />related items of work necessary for the installation. No additional compensation will be allowed
<br />therefore.
<br />Item No. 6 — Install No. 5 Pull Box
<br />This work consists of furnishing and installing and/or replacing pull box including Concrete Lid,
<br />the removal and/or modification of any interfering portions of existing pull box, conduit, PCC,
<br />concrete and asphalt restoration, as indicated on plans and directed by the Engineer.
<br />The unit price for each Pull Box shall be considered full compensation for furnishing all labor,
<br />materials, tools, equipment, removals, paving, landscape repair, irrigation repair, root shaving,
<br />sidewalk restoration, and appurtenances for all related items of work necessary for the
<br />installation. No additional compensation will be allowed therefore.
<br />Item No. 7 — Pothole Street Light Pole Location
<br />Payment for Pothole Street Light Pole Location shall be considered full compensation for
<br />furnishing all labor, materials, tools, equipment, removals, excavation, paving, landscape repair,
<br />irrigation repair, root shaving, sidewalk restoration, pothole and trench backfill per City Std. Plan
<br />1150, permanent asphalt replacement, permanent PCC replacement and appurtenances for all
<br />related items of work necessary for the installation. No additional compensation will be allowed
<br />therefore.
<br />Item No. 8 — Traffic Control Work
<br />The work under this item for Signing and Striping shall be in accordance with the latest Watch
<br />Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's
<br />Special Provisions/Contract Documents to be provided for each Task Order Work.
<br />City of Santa Ana RFP 23-182
<br />Page Al-15