Laserfiche WebLink
The unit price for each Install Electrical Meter Pedestal shall be considered full compensation for <br />furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation <br />repair, root shaving, sidewalk restoration, and appurtenances for all related items of work <br />necessary for the installation. No additional compensation will be allowed therefore. <br />Item No. 5 — Install 211 PVC Conduit <br />This work consists of furnishing and installing Polyvinylchloride (PVC) street lighting conduit <br />including pull tape, ground wire, fittings, duct seal, utility potholing, concrete or asphalt <br />restoration and appurtenances complete and in place, of the size indicated on the plans. <br />The unit price bid per linear foot of PVC Conduit shall be considered full compensation for <br />furnishing all labor, materials, tools, equipment, removals, paving, landscape repair, irrigation <br />repair, root shaving, sidewalk restoration, pothole and/or trench backfill per City Std. Plan 1150, <br />permanent asphalt replacement, permanent PCC replacement, striping and appurtenances for all <br />related items of work necessary for the installation. No additional compensation will be allowed <br />therefore. <br />Item No. 6 — Install No. 5 Pull Box <br />This work consists of furnishing and installing and/or replacing pull box including Concrete Lid, <br />the removal and/or modification of any interfering portions of existing pull box, conduit, PCC, <br />concrete and asphalt restoration, as indicated on plans and directed by the Engineer. <br />The unit price for each Pull Box shall be considered full compensation for furnishing all labor, <br />materials, tools, equipment, removals, paving, landscape repair, irrigation repair, root shaving, <br />sidewalk restoration, and appurtenances for all related items of work necessary for the <br />installation. No additional compensation will be allowed therefore. <br />Item No. 7 — Pothole Street Light Pole Location <br />Payment for Pothole Street Light Pole Location shall be considered full compensation for <br />furnishing all labor, materials, tools, equipment, removals, excavation, paving, landscape repair, <br />irrigation repair, root shaving, sidewalk restoration, pothole and trench backfill per City Std. Plan <br />1150, permanent asphalt replacement, permanent PCC replacement and appurtenances for all <br />related items of work necessary for the installation. No additional compensation will be allowed <br />therefore. <br />Item No. 8 — Traffic Control Work <br />The work under this item for Signing and Striping shall be in accordance with the latest Watch <br />Manual, CA MUTCD, Caltrans and any City Standard Specifications, plans, and/or any City's <br />Special Provisions/Contract Documents to be provided for each Task Order Work. <br />City of Santa Ana RFP 23-182 <br />Page Al-15 <br />