Sample Task Order D Items of Work
<br />Item No. 1— Furnish and Install Streetlight Pole
<br />This work consists of furnishing and installing Ameron 4B 127 Street Light Pole including
<br />foundation, 2" PVC (stub out) conduits, Grout cap, 8' Clamp -On Arm Assembly, Overhead Pin
<br />& Insulator, LED Luminaire, 8-8 Bard Duplex Aluminum Conductor wiring, and any other work
<br />required to provide the intended operation at the locations shown on the project plans per City of
<br />Santa Ana Special Provisions and Standard Plans 1126H-3 and 1126H-2 and 1104.
<br />The unit price for each Street Light Pole shall be considered full compensation for furnishing all
<br />labor, materials, tools, equipment, removals, excavation, landscape repair, turf repair, hardscape
<br />repair, irrigation repair, root shaving, tree trimming, sidewalk restoration, and appurtenances for
<br />all related items of work necessary for the installation. No additional compensation will be
<br />allowed therefore.
<br />Item No. 2 — Remove Existing Wooden Pole
<br />This work consists of removing and discarding Street Light Pole including luminaire arm,
<br />existing overhead wiring, and any other appurtenances. Salvage equipment as directed by
<br />Engineer.
<br />The unit price for each removed Street Light Pole shall be considered full compensation for all
<br />labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair,
<br />hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items
<br />of work necessary for the removal. No additional compensation will be allowed therefore.
<br />Item No. 3 — Remove Existing Steel Pole
<br />This work consists of removing and discarding Street Light Pole including foundation, luminaire
<br />arm, overhead wiring, and any other appurtenances. Salvage equipment as directed by Engineer.
<br />The unit price for each removed Street Light Pole shall be considered full compensation for all
<br />labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair,
<br />hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items
<br />of work necessary for the removal. No additional compensation will be allowed therefore.
<br />Item No. 4 — Install Electrical Meter Pedestal
<br />This work consists of furnishing and installing Electrical Meter Pedestal including foundation,
<br />circuit breakers, photocell, contactors, conduits, wiring, SCE coordination, electrical permit and
<br />any other work required to provide the intended operation at the location required per City of
<br />Santa Ana Special Provisions, Standard Plan 1126M and any approved Southern California
<br />Edison Design Plans.
<br />City of Santa Ana RFP 23-182
<br />Page Al-14
<br />
|