Laserfiche WebLink
Sample Task Order D Items of Work <br />Item No. 1— Furnish and Install Streetlight Pole <br />This work consists of furnishing and installing Ameron 4B 127 Street Light Pole including <br />foundation, 2" PVC (stub out) conduits, Grout cap, 8' Clamp -On Arm Assembly, Overhead Pin <br />& Insulator, LED Luminaire, 8-8 Bard Duplex Aluminum Conductor wiring, and any other work <br />required to provide the intended operation at the locations shown on the project plans per City of <br />Santa Ana Special Provisions and Standard Plans 1126H-3 and 1126H-2 and 1104. <br />The unit price for each Street Light Pole shall be considered full compensation for furnishing all <br />labor, materials, tools, equipment, removals, excavation, landscape repair, turf repair, hardscape <br />repair, irrigation repair, root shaving, tree trimming, sidewalk restoration, and appurtenances for <br />all related items of work necessary for the installation. No additional compensation will be <br />allowed therefore. <br />Item No. 2 — Remove Existing Wooden Pole <br />This work consists of removing and discarding Street Light Pole including luminaire arm, <br />existing overhead wiring, and any other appurtenances. Salvage equipment as directed by <br />Engineer. <br />The unit price for each removed Street Light Pole shall be considered full compensation for all <br />labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair, <br />hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items <br />of work necessary for the removal. No additional compensation will be allowed therefore. <br />Item No. 3 — Remove Existing Steel Pole <br />This work consists of removing and discarding Street Light Pole including foundation, luminaire <br />arm, overhead wiring, and any other appurtenances. Salvage equipment as directed by Engineer. <br />The unit price for each removed Street Light Pole shall be considered full compensation for all <br />labor, materials, tools, equipment, removals, excavation, paving, landscape repair, turf repair, <br />hardscape repair, irrigation repair, sidewalk restoration, and appurtenances for all related items <br />of work necessary for the removal. No additional compensation will be allowed therefore. <br />Item No. 4 — Install Electrical Meter Pedestal <br />This work consists of furnishing and installing Electrical Meter Pedestal including foundation, <br />circuit breakers, photocell, contactors, conduits, wiring, SCE coordination, electrical permit and <br />any other work required to provide the intended operation at the location required per City of <br />Santa Ana Special Provisions, Standard Plan 1126M and any approved Southern California <br />Edison Design Plans. <br />City of Santa Ana RFP 23-182 <br />Page Al-14 <br />