My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Item 22 - On -Call Emergency Asphalt Concrete, Concrete, and Storm Drain Repair Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2024 12:13:08 PM
Creation date
5/16/2024 11:38:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
22
Date
5/21/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authorship fixed in any tangible medium of expression, including but not limited to, physical <br />drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or <br />caused to be prepared by Contractor under this Agreement ("Documents & Data"). Contractor <br />shall require all subcontractors to agree in writing that City is granted a non-exclusive and <br />perpetual license for any Documents & Data the subcontractor prepares under this Agreement. <br />Contractor represents and warrants that Contractor has the legal right to license any and all <br />Documents & Data. Contractor makes no such representation and warranty in regard to <br />Documents & Data which were provided to Contractor by the City. City shall not be limited in <br />any way in its use of the Documents and Data at any time, provided that any such use not within <br />the purposes intended by this Agreement shall be at City's sole risk. <br />7. INSURANCE <br />Contractor shall procure and maintain for the duration of the contract insurance against <br />claims for injuries to persons or damages to property which may arise from or in connection with <br />the performance of the work hereunder and the results of that work by the Contractor, his agents, <br />representatives, employees or subcontractors. <br />Minimum Scope and Limit of Insurance. Coverage shall be at least as broad as: <br />Commercial General Liability (CGL): Insurance Services Office Form CG 00 01 covering <br />CGL on an "occurrence" basis, including products and completed operations, property <br />damage, bodily injury and personal & advertising injury with limits no less than $2,000,000 <br />per occurrence. If a general aggregate limit applies, either the general aggregate limit shall <br />apply separately to this project/location (ISO CG 25 03 or 25 04) or the general aggregate <br />limit shall be twice the required occurrence limit. <br />Automobile Liability: ISO Form Number CA 00 01 covering any auto (Code 1), or if <br />Contractor has no owned autos, hired, (Code 8) and non -owned autos (Code 9), with <br />limit no less than $1,000,000 per accident for bodily injury and property damage. <br />Workers' Compensation: as required by the State of California, with Statutory Limits, and <br />Employer's Liability Insurance with limit of no less than $1,000,000 per accident for bodily <br />injury or disease. <br />If the Contractor maintains broader coverage and/or higher limits than the minimums <br />shown above, the City requires and shall be entitled to the broader coverage and/or the higher <br />limits maintained by the contractor. Any available insurance proceeds in excess of the specified <br />minimum limits of insurance and coverage shall be available to the City. <br />Other Insurance Provisions. The insurance policies are to contain, or be endorsed to <br />contain, the following provisions: <br />Additional Insured Status. The City, its officers, officials, employees, and volunteers are <br />to be covered as additional insureds on the CGL policy with respect to liability arising out of work <br />or operations performed by or on behalf of the Contractor including materials, parts, or equipment <br />furnished in connection with such work or operations. General liability coverage can be provided <br />in the form of an endorsement to the Contractor's insurance (at least as broad as ISO Form CG 20 <br />Page 3 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.