Local Street Preventative Maintenance FY 2023-24 <br />May 21, 2024 <br />Page 3 <br />A total of five bids were received and all were deemed responsive. All American <br />Asphalt submitted the lowest responsive base bid in the amount of $2,558,098 (Exhibit <br />3). As specified in the bid documents, the lowest bid shall be determined on the basis of <br />the Base Bid. Based on the bid analysis and a contractor's reference check, staff <br />recommends awarding the construction contract to All American Asphalt for the base <br />bid of $2,558,098 (Exhibit 4), excluding the alternate bid. <br />All American Asphalt has previously performed work as a prime contractor in the City of <br />Santa Ana within the last five years, most recently completing the Local Street <br />Preventative Maintenance FY 2021-22 Project and the 17t" Street Improvement Project. <br />A reference check was made with staff and good reviews were received regarding the <br />quality of work performed by the contractor on previous projects. <br />Project Delivery <br />To deliver a complete project, in addition to the construction contract, the estimated total <br />project delivery cost includes construction administration, inspection, and testing, along <br />with an allowance for contingencies to account for unexpected or unforeseen <br />conditions. Construction administration and inspection includes construction <br />management and implementation of the labor requirements. As indicated in the Cost <br />Analysis (Exhibit 5) and as summarized in the table below, the estimated total <br />construction delivery cost of the project is $3,198,098. <br />Project Item <br />Total <br />Construction Contract Bid Amount <br />$2,558,098 <br />Construction Administration, Inspection, Testing <br />$ 384,000 <br />Project Contingencies <br />$ 256,000 <br />TOTAL ESTIMATED CONSTRUCTION DELIVERY COST <br />$3,198,098 <br />ENVIRONMENTAL IMPACT <br />In accordance with the California Environmental Quality Act, the recommended actions <br />are exempt from further review. Categorical Exemption Environmental Review No. ER- <br />2024-8 was filed for Project 24-6907. <br />FISCAL IMPACT <br />As indicated in the Cost Analysis, the estimated total construction delivery cost of the <br />project (24-6907) is $3,198,098, which includes construction, contract administration, <br />inspection, testing, and authorized contingencies of $256,000. All funds are available for <br />expenditure in Fiscal Year 2023-24 Capital Improvement Program (Exhibit 6). However, <br />any remaining balances not expended at the end of the fiscal year will be carried <br />forward into FY 2024-25. A proposed carry-over of unspent funds will be presented to <br />the City Council for the FY 2024-25 portion of this contract. <br />The proposed contract enables Staff to authorize a construction cost increase of up to <br />25% if necessary for contingencies. Staff expect to utilize other available Public Works <br />