Laserfiche WebLink
OUTDOOR <br /> DIMENSIONS <br /> INTERIOR . <br /> 7) Installation (per job site) <br /> a. Deliver needed lifts or equipment to site within 2 days of installation, and to be <br /> removed in timely manner after installation complete <br /> b. Monument installation: <br /> i. Footing(s) will be dug prior to inspection taking roughly about 3-4 days. <br /> ii. Once footings are dug, the forms will be set pending inspection to pour <br /> concrete, roughly 2 days. <br /> iii. After inspection is passed sign will be installed taking roughly 1-2 days. <br /> iv. Finally after sign is secured our team will install remaining design features <br /> including: brick veneer/rock and cast bronze plaques, roughly taking 3-4 <br /> days. <br /> b. Digital Display Setup: <br /> i. City of Santa Ana content managing team will require to meet with <br /> Daktronics Technician, location TBD, to run through short course on content <br /> management and uploading. <br /> 5325 East Hunter Avenue,Anaheim CA.90807 P:714.579.9555 F:714.893.5978 <br /> ©2019 Outdoor Dimensions,LLC. All Rights Reserved. <br /> City Council 14 — 184 5/21/2024 <br />