Laserfiche WebLink
OUTDOOR <br /> DIMENSIONS <br /> INTERIORSIGNS BANNERS- FLAGS- . <br /> vi. Once structure is completely dry it will be transferred to assembly <br /> department where electrical components will be assembled. <br /> vii. Final step in production will be layered anti-graffiti coat application. <br /> b. Representatives from City of Santa Ana are welcome to visit OD during the <br /> production process as desired <br /> c. Completed signs will be inspected against approved shop drawings and samples <br /> by dedicated quality control inspection team <br /> d. Proposed designs production timeline approximately 5-7 weeks to complete per <br /> location. <br /> 5) Quality review <br /> a. Client is invited to inspect signage after production, but before installation <br /> b. Any quality issues found will be addressed before installation dates <br /> 6) Site Walk and Preparation (per job site) <br /> a. Site safety plan to be worked out with City of Santa Ana construction team <br /> i. Will include lift safety plan and access plan for any overhead signage <br /> b. Final field conditional and measurements to be verified by Outdoor Dimensions <br /> 5325 East Hunter Avenue,Anaheim CA.90807 P:714.579.9555 F:714.893.5978 <br /> ©2019 Outdoor Dimensions,LLC. All Rights Reserved. <br /> City Council 14 — 183 5/21/2024 <br />