My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br /> Report No.: SOS <br /> Contractor: Lonerock,Inc. PCO#: <br /> Project, Warner Avenue Improvements Project Revision: 5/1012023 <br /> Project No.:14-6802;18-6424;20-6618 pate: 5/10123 <br /> Owner: City of Santa Ana <br /> t to instal!2"wafer services and 12"valve <br /> Description of Work: Additional cos <br /> backfilling trench <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT M$92-57 $125.81 <br /> T BENEFIT` AMOUN$ <br /> O 00 <br /> John Williams(Operator) 0 62.78 <br /> 0 62.78 $0.00 <br /> Guillermo Saldana(Operator) $0.00 <br /> Ramon Guillen(Foreman Mason) 35.07 <br /> Salvador Saldana(Labor IV) 0 <br /> Ricardo Guillen(Cement Mason) $93.83 $125-90 $0.00 <br /> Ramon Guillen Jr.(Mason) 2 $93.83 $125.90 $1$0.66 <br /> Cruz Benavente Chan(App) $71.25 $98.67 $0.00 <br /> Peter Arroyo(App) $71.25 $98.67 .0 <br /> Jesus Gomez(Labor IV) 2 $92.57 $125.81 185 14 <br /> 00 <br /> . 0. <br /> $71.25 $9867 <br /> Jorge Alejandres(Labor App IV) $0.00 <br /> Explain Additional Benefit: SUBTOTAL $ 7-450 <br /> MU 20% �_$_.5_6 <br /> - - -- - - - TOTAL LABOR $447.36 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS AMOUNTS <br /> T 00 <br /> CAT 336EL Excavator 187.52 <br /> CAT 345CL Excavator fl $256.50 $0.00 <br /> CAT 415E Skip Loader 0- $47.87 $0.00 <br /> CAT 450F Backhoe Loader $83.95 $0.00 <br /> CAT 450E Backhoe Loader $83.95 $0.00 <br /> CAT 950H Loader $136.17 $0.00 <br /> CAT 972H Loader $206.74 $0.00 <br /> CAT 262D Skid Steer Loader 2 $ 8. 0.50 <br /> CAT CB24B Roller $38.72 $0.00 <br /> Air Compressor 185 wlbreaker S36.28 $0.00 <br /> Dump Truck 2 axle 0 $50.64 $0.00 <br /> Crew Truck 20000 LB $37.19 $0.00 <br /> Water I rut 4.00 <br /> CAT 315E 0 $61.38 <br /> H100 Hammer $18.84 $0.00 <br /> 'Explain Other Costs: SUBTOTAL $170.58 <br /> MU 15°10 $25.59 <br /> - - TOTAL EQUIPMENT $196.17 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS QTY. PRICE AMOUNTS <br /> Saddle&all other feedings&toper ipe EA 0 3.497.09 $0.00 <br /> Concrete EA 0 6.78 $0.00 <br /> 120.72 $0.00 <br /> SUBTOTAL $0.00 <br /> - MU 15% - $0.00 <br /> TOTAL MATERIAL $0.00 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS' AMOUNTS <br /> Traffic control 2 $68.75 0.00 $137.50 j <br /> Plate EA 10 $1100 110.00 <br /> .Explain Other Costs: UBTOTAL $247.50 <br /> MU 15% $37.13 <br /> - - TOTAL OTHER WORK $284.6 <br /> If Abo ndCmead Correct OTAL LABOR $447.36 <br /> n <br /> TOAL EQUIPMENT $196.17 <br /> antract epr ve <br /> City CoLlrlc� 11 - 614 BONI11 5 024 <br /> Ownet s Representative TOTAL THIS PROPOSAL $5 7,43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.