Laserfiche WebLink
DAILY EXTRA WORK REPORT �o q <br /> Report No.: <br /> Contractor Lonerock,Inc. PCO#:�- <br /> Project: Warner Avenue Improvements Project Revision: 5/1112023 <br /> Project No.:14-6802;18-6424;20-5618 Date: 511/)03 <br /> Owner: City of Santa Ana <br /> Description of Work: Additional cost to install 2"water services and 12"valve <br /> Backfill trench for valve and water service,instalivalve can and concrete <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT` AMOUNTS00 <br /> John Williams(Operator) 0 $119-42 $162.78 <br /> Guillermo Saldana(Operator) 0 $119.42 $162.g$125.81 <br /> $0.00 <br /> $99.94 $0-DO <br /> Ramon Guillen(Foreman Mason) $740.56 <br /> Salvador Saldana(Labor IV) 8 $92-Sr $000 <br /> Ricardo Guillen(Cement Mason) $9383 g $ -83 $750.64 <br /> Ramon Guillen Jr. (Mason) $0-00 <br /> Cruz Benavente Chan{App} $71.25 $98.67 <br /> Peter Arro Y o App) $71.25 $98.67 $0.00 <br /> ( 740- 6 <br /> Jesus Gomez(Labor IV) 8 $92.57 $125-81 <br /> $71.25 $98.67 $0A0 <br /> Jorge Alejandres(Labor App IV) $0.00 <br /> Explain Additional Benefit: SUBTOTAL $$446.35 <br /> -- - - -- -TOTAL LABOR $2,678.11 <br /> EQUIPMENT SBY OPP. SBY OPP- OTHER EXTENDED <br /> Description HRS. HRS. COST COST COSTS` AMOUNTS- <br /> T 00 <br /> CAT 336EL Excavator $187.52 <br /> CAT 345CL Excavator 0 $256.50 $0.00 <br /> CAT 415F Skip Loader 8 $47.87 $382. 6 <br /> CAT 45OF Backhoe Loader $83-95 $0.00 <br /> CAT 450E Backhoe Loader $B3.95 $0.00 <br /> CAT 950H Loader $136.17 $0-00 <br /> CAT 972H Loader $206,74 $0.00 <br /> CAT 262D Skid Steer Loader 0 $40.25 $0.00 <br /> CAT CB24B Roller $38 72 $0.00 <br /> Air Compressor 185 wlbreaker $36.28 $0-00 <br /> Dump Truck 2 axle 0 $50.64 $0.00 <br /> Crew Truck 20000 LB $37.19 $0:00 <br /> 4 <br /> $90-59- <br /> Water I rut $D.00 <br /> CAT 315F 0 $61.38 <br /> H100 Hammer $19.54 $0.00 <br /> Explain Other Costs: SUBTOTAL - $473.04 <br /> Mil 15% $70.96 <br /> - - - TOTAL EQUIPMENT $544,00 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS QTY. PRICE AMOUNTS <br /> Saddle&all other feedin s&toper pipe EA 0 3,497.09 $0 00 <br /> Concrete EA 14 6.78 �$9441922 <br /> - <br /> Vave cover and and 8"pipe 215-54 <br /> SUBTOTAL _ <br /> MU 15a/o $14.24 <br /> TOTAL MATERIAL $109.16 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS QTY. PRICE COSTS" AMOUNTS <br /> Traffic contras <br /> In 8 $68.75 0.00 S550.00 <br /> Plate EA 10 $11.-co $110.00 <br /> Explain Other Costs: SUBTOTAL_ $660.00 <br /> MU 15% _$99.00 <br /> - - - - - TOTAL OTHER WORK $759.00 <br /> If Ab�ecord plete and Correct TOTAL LABOR $2.678.11 <br /> /- TOAL EQUIPMENT $544.00 <br /> City councl 11 - 615 BOND 1 024 <br /> ' Owners RepresetitaGve <br /> TOTAL THIS PROPOSAL $4,131.1 <br />