My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY EXTRA WORK REPORT <br /> Report No.: � 2 `o <br /> Contractor: Lonerock,Inc. PCO#: <br /> Project: Warner Avenue Improvements Project Revision: 5/12I2023 <br /> Project No.:14-8802;18-6424;20-6618 Date: 5/12723 <br /> Owner: City of Santa Ana <br /> Description of Work: Additional cost to install 2"water services and 12"Valve <br /> Paving trench for valve and water services <br /> LABOR HOURS HOURLY RATE ADDITIONAL EXTENDED <br /> Name&Classification Regular OT Regular OT BENEFIT' AMOUNTS <br /> G $119.42 $152.18 90. 00 <br /> John Williams(Operator) 0.00 <br /> Guillermo Saldana(Operator) 0 $119.42 $162.78 <br /> Ramon Guillen(Foreman Mason) $99.94 $135.07 $0.00 <br /> Salvador Saldana(Labor IV) 6 $92.57 $125.81 $5$0.42 <br /> $93.83 $125.90 $0.00 <br /> Ricardo Guillen(Cement Mason) $562 98 <br /> Ramon Guillen Jr. (Mason) 6 $93-83 $125.90 <br /> Cruz.Benavente Chan(App) $71.25 $98.67 0.00 <br /> Peter Arroyo(App) $71.25 $98.67 $0.00 <br /> Jesus Gomez(Labor IV) <br /> 6 $92.57 $125.81 $555.42 <br /> Jorge Alejandres(Labor App IV) 4 $71.25 $98-67 $285.00 <br /> $D.Do <br /> 'Explain Additional Benefit: SUBTOTAL $1,958.82 <br /> MU 201% $391,76 <br /> - - - - - TOTAL LABOR $2,350.58 <br /> EQUIPMENT SBY OPP. SBY OPP. OTHER EXTENDED <br /> Description HRS, HRS. COST COST COSTS` AMOUNTS <br /> AT 336EL Excavator $187.52 $0 00 <br /> CAT 345CL Excavator -0- $256.50 0-00 <br /> CAT 415F Skip Loader $47.87 $0.00 <br /> CAT 450F Backhoe Loader $83.95 $0.00 <br /> CAT 45DE Backhoe Loader 3 $83.95 251.85 <br /> CAT 950H Loader 4 $136. $0 <br /> 17 $5$000 <br /> CAT 972H Loader $206.74 .00 <br /> CAT 262D Skid Steer Loader © $40.25 0.00 <br /> CAT CB24B Roller 6 $38.72 $232.32 <br /> Air Compressor 185 wlbreaker $36.28 $0.00 <br /> Dump Truck 2 axle 6 $50.64 $303.84 <br /> Crew Truck 20DD0 LB 4 $37.19 $148.76 <br /> Water rue <br /> T45.04 <br /> CAT 315F 0 $61.38 $0.00 <br /> H100 Hammer $19.84 $0.00 <br /> 'Explain Other Costs: SUBTOTAL $ .45 <br /> $2T <br /> MU 15% 222.22 <br /> EQUIPMENT $1,703.67 <br /> MATERIAL UNIT EXTENDED <br /> Description(Attach Invoice) UNITS CITY. PRICE AMOUNTS <br /> Asphalt Ton 12 10500 $1,260.00 <br /> tack cot EA 2 75.00 $150.00 <br /> EA 0 0.00 $0.00 <br /> SUBTOTAL $1,410.00 <br /> MU 15% $211.50 <br /> TOTAL MATERIAL $1,621-50 <br /> OTHER WORK UNIT OTHER EXTENDED <br /> UNITS CITY, PRICE COSTS' AMOUNTS <br /> Traffic control h 7 $68-75 0.00 $481.25 <br /> Plate EA 10 $11.00 $110.00 <br /> 'Explain Other Costs: SUBTOTAL $591.25 <br /> MU 15% $88.69 <br /> - - - - TOTAL OTHER WORK( $679.94 <br /> If Abo Record is Complete and Correct TOTAL LABOR $2,350.58 <br /> ^ TOAL EQUIPMENT $1,703.67 <br /> f conttacto reserst-ative TOTAL MATERIAL $2,301.44 <br /> L <br /> -B�t` �' �],�� - - BOND 110 <br /> $63.56 <br /> -MPMR IF <br /> epresentalive ' <br /> City CBri� 11 - 6 024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.