My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ LO N E R O C K, INC. P.O. Box 54503, Irvine, CA 92619 <br /> Tel: 949-310-0804 <br /> Fax:949-387-6102 <br /> California Contractor's License##A- 834112 dragan@lonerockinc.com <br /> TO: City of Santa Ana, Public Works Agency M-22 <br /> 20 Civic Center Plaza,Santa Ana,CA 92701 <br /> Project: Warner Ave.Improvements Project No. 14-6802 <br /> Date: April 16,2024 <br /> Subject: Cost Estimate for 5 storm drain culverts for strip mall and Wells Fargo lots r1 <br /> Attn: Mr. Edward Torres <br /> Warner Ave.Improvements/Santa Ana <br /> Description Qty Rate Total <br /> Warner Ave.Improvements additional costs to rebuild and extend 5 existing storm drain culverts to new <br /> Warner Ave.curb from the Strip Mall and Wells Fargo properties.Contract documents did not include this <br /> work.Culverts to be constructed per City Standard Plan No.318 for S=2'opening.Price includes labor and <br /> material to excavate/backfill,place concrete and steel for the culverts.Work to only be performed in <br /> public/City's right of way or property.Private property owners are responsible to construct culvert on <br /> their property if necessary. <br /> ............................................................................... <br /> Lump Sum Pricing: <br /> a. LABOR $9,900/EA x 5 EA=$49,500.00 <br /> b. EQUIPMENT $1,750/EA x 5 EA=$8,750.00 <br /> c. MATERIAL $2,630/EA x 5 EA=$13,150.00 <br /> GRAND TOTAL: $14,280.00/EA x 5 EA = $71,400.00 <br /> ............................................................................... <br /> This proposal requires 7 working days extension. <br /> This proposal is predicated on all work being completed during normal working hours. <br /> This proposal may be subject to revision if not approved within 15 days of submission. <br /> The above quoted amount covers only the presently ascertainable direct costs of the above-referenced changes and <br /> does not include unforeseen conditions encountered during construction or delays beyond our control.It excludes <br /> costs associated with the impact to these changes upon the project schedule,labor productivity or other factors <br /> affecting the cost of performance.Lonerock,Inc.expressly reserves the right to claim any added costs and time <br /> extensions caused by this change alone or in conjunction with other changes.We reserve the right to correct this <br /> quote for errors or omissions. <br /> ............................................................................... <br /> CLIENT ACCEPTANCE <br /> NAME: A�&A� . <br /> DATE: toor <br /> SIGNATURE: <br /> TITLE: <br /> City Council 11 — 715 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.