My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2024-05-21
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
05/21/2024
>
Agenda Packet_2024-05-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2024 12:33:39 PM
Creation date
5/16/2024 1:28:27 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/21/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1881
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ LO N E R O C K, INC. P.O. Box 54503, Irvine, CA 92619 <br /> Tel: 949-310-0804 <br /> Fax:949-387-6102 <br /> California Contractor's License##A- 834112 dragan@lonerockinc.com <br /> TO: City of Santa Ana, Public Works Agency M-22 <br /> 20 Civic Center Plaza,Santa Ana,CA 92701 <br /> Project:Warner Ave.Improvements Project No. 14-6802 <br /> Date: February 15, 2024 <br /> Subject: Cost Estimate for Graffiti Protection Coating on Sound Walls <br /> Attn: Mr. Edward Torres <br /> Warner Ave.Improvements/Santa Ana <br /> Description Qty Rate Total <br /> Warner Ave.Improvements additional costs to provide graffiti protection coating(Sure Klean Weather Seal <br /> Blok-Guard&Graffiti Control WB 6)for the soundwall. <br /> ............................................................................... <br /> Lump Sum Pricing: <br /> a. LABOR $22,300.00 <br /> b. EQUIPMENT $1,800.00 <br /> c. MATERIAL $11,600.00 <br /> GRAND TOTAL: $35,700.00 <br /> ............................................................................... <br /> This proposal requires 5 working days extension. <br /> This proposal is predicated on all work being completed during normal working hours. <br /> This proposal may be subject to revision if not approved within 15 days of submission. <br /> The above quoted amount covers only the presently ascertainable direct costs of the above-referenced changes and <br /> does not include unforeseen conditions encountered during construction or delays beyond our control.It excludes <br /> costs associated with the impact to these changes upon the project schedule,labor productivity or other factors <br /> affecting the cost of performance.Lonerock,Inc.expressly reserves the right to claim any added costs and time <br /> extensions caused by this change alone or in conjunction with other changes.We reserve the right to correct this <br /> quote for errors or omissions. <br /> ............................................................................... <br /> CLIENT ACCEPTANCE <br /> NAME: <br /> DATE: <br /> SIGNATURE: <br /> TITLE: <br /> City Council 11 — 716 5/21/2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.