Laserfiche WebLink
CITY OF SANTA ANA <br /> c. All areas shall be kept free of weeds at all times. <br /> d. There shall be no spraying of weeds in sand court areas. <br /> e. Areas shall be edged and the turf surrounds maintained. If sand berms <br /> accumulate in turf, they must be removed and replaced with sod. <br /> f. All sand areas shall be rototilled monthly, at least three (3) weeks apart, <br /> to the maximum depth that will allow complete loosening of the sand but <br /> will not cause lower base materials to be mixed in with the sand <br /> (approximately 12"). After rototilling, all areas shall be raked level. <br /> g. Sand shall be replenished as necessary to maintain optimum level in <br /> each area. Generally, six inches (6") below the top of the concrete <br /> curbing is acceptable. However, dependent upon play equipment footing, <br /> the final level shall be determined by CR for each area. Sand will be <br /> provided by the City but spread and leveled by the Contractor. <br /> h. In the event of storms and periods of excessive rainfall, or the sand court <br /> areas become flooded resulting in standing water, the Contractor shall <br /> remove the water immediately, as directed by the CR. Water shall be <br /> discharged to a safe area. <br /> 2. Hard Surface Areas <br /> These areas include concrete sidewalks, medians, skate parks, tennis courts, <br /> handball courts, basketball courts, bicycle trails, asphalt concrete (AC) walkways, <br /> and bandshells. <br /> a. All areas shall be inspected daily and maintained in a neat, clean, and <br /> safe condition at all times. Any hazards shall be reported immediately <br /> to the CR. <br /> b. All areas shall be swept or blown daily to remove all deposits of silt, <br /> sand, glass, and all foreign objects. <br /> c. All sports courts, stages, and bandshells shall be power washed per <br /> the pressure washing schedule, or as needed. The contractor will <br /> work with the CR to determine the schedule. <br /> d. Cracks and crevices must be kept free of weeds at all times. <br /> e. Sidewalks should be blown daily, reference Section A., General <br /> Operations, No.3. <br /> 3. Bicycle Trails/AC Walkways <br /> Special emphasis shall be placed on chemical edging along these areas to <br /> prevent damage to asphalt by vegetation. All such damage shall be repaired at <br /> Contractor's sole expense. <br /> 4. Decomposed Granite (DG) Surfaces, Walkways, and Trails <br /> RFP 23-151 Landscape Maintenance Services Page 26 of 135 <br />