My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Clerk
>
Contracts / Agreements
>
P
>
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 5:17:54 PM
Creation date
5/17/2024 10:36:18 AM
Metadata
Fields
Template:
Contracts
Company Name
PCA ARBORISTS & CONSULTANTS, INC. DBA PACIFIC COAST HORTICULTIST
Contract #
A-2024-007-04
Agency
Public Works
Council Approval Date
1/16/2024
Expiration Date
1/31/2027
Insurance Exp Date
5/17/2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> c. All areas shall be kept free of weeds at all times. <br /> d. There shall be no spraying of weeds in sand court areas. <br /> e. Areas shall be edged and the turf surrounds maintained. If sand berms <br /> accumulate in turf, they must be removed and replaced with sod. <br /> f. All sand areas shall be rototilled monthly, at least three (3) weeks apart, <br /> to the maximum depth that will allow complete loosening of the sand but <br /> will not cause lower base materials to be mixed in with the sand <br /> (approximately 12"). After rototilling, all areas shall be raked level. <br /> g. Sand shall be replenished as necessary to maintain optimum level in <br /> each area. Generally, six inches (6") below the top of the concrete <br /> curbing is acceptable. However, dependent upon play equipment footing, <br /> the final level shall be determined by CR for each area. Sand will be <br /> provided by the City but spread and leveled by the Contractor. <br /> h. In the event of storms and periods of excessive rainfall, or the sand court <br /> areas become flooded resulting in standing water, the Contractor shall <br /> remove the water immediately, as directed by the CR. Water shall be <br /> discharged to a safe area. <br /> 2. Hard Surface Areas <br /> These areas include concrete sidewalks, medians, skate parks, tennis courts, <br /> handball courts, basketball courts, bicycle trails, asphalt concrete (AC) walkways, <br /> and bandshells. <br /> a. All areas shall be inspected daily and maintained in a neat, clean, and <br /> safe condition at all times. Any hazards shall be reported immediately <br /> to the CR. <br /> b. All areas shall be swept or blown daily to remove all deposits of silt, <br /> sand, glass, and all foreign objects. <br /> c. All sports courts, stages, and bandshells shall be power washed per <br /> the pressure washing schedule, or as needed. The contractor will <br /> work with the CR to determine the schedule. <br /> d. Cracks and crevices must be kept free of weeds at all times. <br /> e. Sidewalks should be blown daily, reference Section A., General <br /> Operations, No.3. <br /> 3. Bicycle Trails/AC Walkways <br /> Special emphasis shall be placed on chemical edging along these areas to <br /> prevent damage to asphalt by vegetation. All such damage shall be repaired at <br /> Contractor's sole expense. <br /> 4. Decomposed Granite (DG) Surfaces, Walkways, and Trails <br /> RFP 23-151 Landscape Maintenance Services Page 26 of 135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.