Laserfiche WebLink
EXHIBIT A <br />REVISED Proposal to Provide Peer Review of a <br />Traffic Report and Noise Report Prepared for the Mater Dei High School Project in Santa Ana, California <br />SCOPE OF WORK <br />This section identifies how ECORP's services will be provided and how our deliverables will be <br />completed. <br />Task 1 - Kickoff Meeting <br />The ECORP Project Manager or their Designee will virtually attend one (1) kick-off meeting with the <br />Project Applicant and City staff. <br />Deliverable: <br />Meeting attendance <br />Task 2 - Peer Review of Technical Studies <br />The technical studies will be reviewed to determine if the studies are adequately prepared in <br />compliance with the California Environmental Quality Act (CEQA). In general, the reports will be <br />reviewed to ensure that all elements of the project have been evaluated (including any required <br />offsite improvements), that surveys, modeling, and other analyses have been conducted in <br />accordance with accepted agency or industry protocols, and whether proposed mitigation has nexus <br />to anticipated impacts and will be effective in reducing impacts. The reports/studies will be reviewed <br />to determine if appropriate standard methods and applicable agency protocols were used to <br />complete the studies. Requirements for additional studies or analyses, if applicable, will be noted in <br />the review, but are not included in this scope of work. We have assumed that ECORP will conduct <br />two reviews of the technical studies: an initial review and a review of the revised technical studies to <br />ensure that comments from the initial review were incorporated into the revised studies. <br />The reports will be reviewed as detailed in Tasks 2.1 and 2.2 below. <br />2.1 — Peer Review of the Acoustical Assessment (ECORP) <br />ECORP will conduct a peer review of the June 2023 Acoustical Assessment prepared for the Project <br />by Kimley Horn. Senior -level staff members who are subject experts will review the New Mater Dei <br />High School noise analysis in accordance with CEQA. The emphasis will be on consistency with <br />current industry standards of practice. For instance, existing ambient noise levels currently <br />experienced in the vicinity should be identified by conducting baseline noise level measurements in <br />the vicinity of the noise -sensitive residential neighborhoods in the vicinity of the Project. Additionally, <br />on -site noise generating activities related to the Project and the associated noise effects at the <br />nearest receptors should be addressed. Additionally, an analysis of Project -generated vibration <br />should be conducted. ECORP staff will review the acoustical assessment to verify if the <br />aforementioned analysis is addressed in Kimley Horn's report. ECORP will provide comments and <br />suggested edits to the Noise Impact Assessment in a draft memorandum for City review. The <br />- A� 11 ECORP Consulting, Inc. Revised May 2,1024 ■ 1 <br />rNNINLIV U 1-Ii I II .;IT V➢ P21-590.02 <br />