My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 30 - Agreement for Public Works Cost Recovery Analysis Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 30 - Agreement for Public Works Cost Recovery Analysis Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:10:27 PM
Creation date
5/29/2024 6:08:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
30
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hourly rate calculations comes directly from time sheets and time keeping systems. These systems <br />are more than the transactional effort of entering hours per project into time sheets. To have a <br />defendable hour rate study, the following steps need to be built: <br />Starting with the end in mind - for a department in the city to recover maximum costs for services <br />they provide - a process must be developed to track and then charge for each step that was taken <br />to provide that service. This process, for many services provided by the city, is directly tied to how <br />many hours each service is required. There are specific rules and requirements that dictate how <br />these hours are tracked and then charged. <br />Through analysis and interviews, we will determine the number of annual billable hours each staff <br />position can reasonably do. This will be dependent on the type of work each person is responsible <br />for. Administrative, clerical, supervision related positions will have fewer billable hours than a front- <br />line engineer or <br />inspector. Each <br />position will be <br />reviewed, and a <br />"target" number <br />of billable hours <br />will be <br />developed. <br />Once those <br />targets are <br />established, that <br />process must <br />Billing Hours <br />Annual Target <br />Develop an individual annual <br />target <br />Analyze Monthly <br />Does each month's actual <br />data support the forecast? <br />Solid data = Equals solid <br />Results <br />Consistent monthly review <br />will ensure success <br />merge with the EW <br />systems used by <br />the city to input <br />and then track Time Keeping System <br />Adjust Recover Costs <br />those hours. Ensure all systems will support No forecast is perfect - be 12 Months of work will result in <br />Each month, the the end goals flexible maximum cost recovery <br />system will <br />report back how the targets are begin met and adjustments can be made to fine tune those <br />targets. At the end of 12 months, reliable data that meets Caltrans requirement will become the <br />basis for the full cost recovery of Caltrans funded projects. <br />This is a key step - one that will drive the entire success of cost recovery for a major section of the <br />city's cost recovery goals. We are confident that we have technical skill to make these calculations <br />and that we have the management skills to develop processes that define repeatable steps that city <br />staff can follow to obtain long term reimbursement of city costs and coach and guide city staff <br />through any challenges that may arise. <br />III. User Fees. <br />A dominant part of the study will be the review of the "traditional" development related user fee <br />service provided by most California cities. The cost of these services are recovered by permit fees <br />that may be fixed in nature - based on an average estimate of time and the full cost of that time - or <br />recovered by a variable measure - based on size, either valuation or square footage. We are <br />Government Consulting Partners �j City of Santa Ana PW Proposal 8 <br />1111_ll <br />
The URL can be used to link to this page
Your browser does not support the video tag.