Laserfiche WebLink
EXHIBIT 1 <br />Services Provided and Implementation Schedule/Proposed Work Plan <br />• Task 4 - Public Review Draft IS-MND. Rincon will typically deliver the Public Review Draft IS-MND within <br />one to two weeks of receipt of comments on the Administrative Draft IS-MND. The Public Review Draft EIR <br />will circulate for a period of 20 to 30 days. Rincon will also assist with preparing and filing the NO, NOC, and <br />Summary Form with the State Clearinghouse (SCH) and the N01 with the County Clerk. <br />• Task 5 -- Final IS-MND. Rincon will prepare written responses and submit them to staff for review within one <br />to two weeks of receipt of all comments received by close of the public review period. Corrections will be <br />made as necessary, and a final set of responses will be provided to enclose with the Final 1S-MND to be <br />considered for approval. The Final IS-MND will typically be provided within one week of receipt of all City <br />comments regardingthe responses. The Final IS-MND will be in the form of a single document that includes <br />the Draft IS-MND, mitigation measures and MMRP as well as all agency and public comments and responses <br />to comments. If desired, we can also prepare CEQA findings for the project in conjunction with the Final IS - <br />MN D. Once the Final IS-MND is approved, and within five days of said approval, Rincon will assist with the <br />preparation and filing of the NOD and filing fees with the SCH and County Clerk. <br />EIR Process <br />• Task 1- Kickoff Meeting. A kickoff meeting will typically be held within two weeks of the notice -to -proceed <br />with City staff to confirm study objectives and approaches, communication protocol, and schedule. <br />• Task 2 - EIR Project Description. Rincon will prepare a description of the project being analyzed, including <br />its site and existing conditions, project characteristics relevant to the EIR analysis, project objectives, and <br />required discretionary approvals. This typically includes textual, tabular, and graphic presentation. <br />• Task 3 - IS-NOP. Rincon will prepare an IS checklist with supporting discussion, typically within four weeks. <br />The IS will cover all items on the City's environmental checklist and will includefacts and analysis to support <br />all conclusions. Upon City approval of the IS, we will circulate the IS and NOP of a Draft EIR for public review. <br />• Task 4 - EIR Scoping Meeting. If required, a scoping meeting will be held during the 30-day NOP period to <br />introduce the community to the proposed project and obtain input on the EIR scope of work (note: scoping <br />meetings are required only for "regionally significant" projects). <br />• Task 5 - Administrative Draft EIR. Rincon will prepare an Administrative Draft EIR within sixto eight weeks <br />of release of the NOR The EIR will include the following: <br />o Executive Summary. Summary of the proposed project and associated environmental consequences <br />presented in tabular format to simplify review by decision -makers and the public. <br />o Introduction and Environmental Setting. Introductory sections (required by CEQA) that lay the <br />groundwork for and summarize the substantive analysis to follow; the introduction describes the <br />purpose and legal authority of the study, and provide a discussion of lead, responsible and trustee <br />agencies; and the environmental setting provides a general description of the existing urban geographic <br />character of the city and the site vicinity. <br />o Environmental Impact Analysis. Analysis of impacts determined in the IS to be potentially significant; <br />includes four main components: <br />- Setting. Description of current conditions with respect to the issue in question, including the <br />existing regulatory environment. <br />- Impact Analysis. Discussion of potentially significant effects of the proposed project, impacts are <br />typically compared to established "thresholds of significance." <br />- Mitigation Measures. Methods by which significant effects can be reduced or eliminated. <br />- Level of Significance after Mitigation. Discussion of whether proposed mitigation measures <br />reduce impacts to below the adopted significance threshold. <br />- Other CEQA-Required Discussions. EIRs also include other discussions required by the CEQA <br />Guidelines, including an analysis of potential growth -inducing impacts, a listing of significant <br />irreversible changes, and a discussion of areas of public controversy. <br />- Alternatives. See alternatives discussion following "Approach To NEPA Document Preparation." <br />• Task 6 - Draft EIR. Rincon will incorporate City comments and complete the Draft EIR, typically within two <br />to three weeks. The Draft EIR will circulate for a period of 30 to 45 days. Rincon will also assist with preparing <br />and filingthe NOA, NOC, and Summary Form with the SCH and the NOA with the County Clerk. <br />• Task 7 - Final EIR. Rincon will complete the Final EIR after the receipt of all written comments received <br />during the review period. The Final EIR will consist of the comments, responses, and corrections to the Draft <br />Rincon Consultants, Inc. 5 <br />