My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 24 - On-Call Environmental Review Services for Federally Funded Programs
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 24 - On-Call Environmental Review Services for Federally Funded Programs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:08:15 PM
Creation date
5/29/2024 6:11:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Community Development
Item #
24
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br />City of Santa Ana <br />On -call Environmental Review Services for Housing Division <br />EIR (if any are warranted), and the MMRP. If desired and required, we will also prepare CEQA Findings and <br />a Statement of Overriding Consideration for the project. <br />o Response to Comments. Within two to three weeks of receipt of all comment letters on the Draft EIR, <br />Rincon will submit draft Response to Comments. Within one week of receipt of City comments on the <br />draft report, Rincon will prepare the final Response to Comments. <br />o MMRP. Concurrent with the Responses to Comments report, Rincon will prepare an MMRP, which will <br />be included in the Final EIR. <br />o NOD. Within five days of EIR certification and project approval (if any), Rincon will assist with the <br />preparation and filing of the NOD with the County Clerk and SCH along with the filing fee (to be paid by <br />the project applicant). <br />Approach to NEPA Document Preparation <br />Upon receiving an inquiry from the City on a particular project with federal agency involvement, an early step will <br />be determining what level of NEPA review will be required. Rincon's project manager will obtain a detailed project <br />description from the City staff members and consider the location, scale, and implementation timeframe. <br />Preliminary research on the site will be conducted, and existing technical studies and environmental <br />documentation will be consulted. The following are typical procedures for an EA/FONSI and EIS. For tasks <br />involving City review, Rincon estimates a period of 15 days for the City to complete a round of review. <br />EA/FONSI Process <br />• Task 1- Kickoff Meeting. Similar to IS-MND process. <br />• Task 2 - Administrative Draft EA/FONSI. The Administrative Draft EA/FONSI will be provided within six to <br />eight weeks of receipt of notice to proceed and approval of the project description. <br />• Task 3 - Public Review Draft EA/FONSI. Rincon will deliver the Public Review Draft EA/FONSI within one <br />to two weeks of receipt of City comments on the Administrative Draft EA/FONSI. <br />• Task 4 - Final EA/FONSI. Rincon will prepare written responses and submit them to City staff for review <br />within seven days of receipt of all comments received after the closing of the public review period. The Final <br />EA/FONSI will be provided within one week of receipt of all comments regarding the responses. <br />EIS Process <br />• Task 1- NOI and Scoping Process. Similar to EIR process. <br />• Task 2 - Scoping Meeting. Similar to EIR process. <br />• Task 3 - Description of Project Alternatives. Similar to EIR process, except all potential alternatives will be <br />described in an equal level of detail, as required by NEPA. <br />• Task 4 - Administrative Draft EIS. Similar to EIR process except all potential alternatives will be analyzed <br />at an equal level of detail, as required by NEPA. <br />• Task 5 - Draft EIS. Similar to EIR process. <br />• Task 6 - Final EIS <br />o Responses to Comments/Preliminary Final EIS. Similar to EIR process. <br />o Final EIS Publication. NEPA requires a 30-day review period for a Final EIS. The EIS will need to be <br />made available for an additional 30-day review period following its publication. <br />• Task 7 - Record of Decision (ROD). The ROD will be issued no sooner than 30 days after the approved Final <br />EIS is distributed or 90 days after the Draft EIS is circulated. <br />We also have experience preparing Categorical Exclusions for capital improvement projects and small residential <br />projects. Categorical Exclusions we have prepared for the City have typically consisted of street improvements <br />(e.g., sidewalk replacements, ADA-curb ramp installations) or other public facility improvements (e.g., parks and <br />libraries). The process and document for a Categorical Exclusion is akin to an abbreviated EA/FONSI, which can <br />be typically completed within six to eight weeks. Historically, the City has managed all NEPA notices; however, <br />Rincon can also assist with the preparation and posting of the Notice of Intent to Request Release of Funds <br />(NOI/RROF) and subsequent RROF. <br />
The URL can be used to link to this page
Your browser does not support the video tag.