Laserfiche WebLink
10.17th Street <br />Ross Street to Broadway <br />Existing Conditions and Recommendations <br />17th Street from Ross Street to Broadway is a one-third mile segment <br />running along the north edge of downtown Santa Ana. Land uses are <br />primarily commercial retail and one apartment complex. As a primary <br />route through the City, it supports high traffic volumes and has <br />high collision rates with one fatality at the Ross Street intersection. <br />Sidewalks, curb ramps, and bus stops are provided on both sides <br />of the street but no bicycle facilities. High visibility crosswalks are <br />missing. Figure 6-11 shows recommended improvements that could <br />be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />Project Location <br />�tA <br />d� <br />07br � <br />1 0 1 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Santa Ana Vision Zero <br />17th St from Ross St to Broadway <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 5,499,832 <br />$ <br />6,959,050 <br />TOTAL RIGHT OF WAY COST $ 220,000 <br />$ <br />267,664 <br />TOTAL CAPITAL OUTLAY COSTS $ 5,720,000 <br />$ <br />7,227,000 <br />$ 720,000 <br />$ <br />880,000 <br />$ 1,010,000 <br />$ <br />1,230,000 <br />RIGHT OF WAY (2%) <br />made. <br />118 <br />