Laserfiche WebLink
RECOMMENDED ENGINEERING IMPROVEMENTS <br />Note: All driveways with bike lanes or separated bike lanes to <br />receive driveway treatments in the form of'continuous sidewalks' <br />or rubber humps. See details page for more information. <br />High Visibility Crosswalk <br />High Visibility School Crosswalk <br />Lane divider and/or c-curb divider <br />Road Striping <br />mini Jill Bike Crossing Markings <br />Bike Lane Marking <br />Bike Sharrow Marking <br />Landscaped Areas <br />- Multi -use Path <br />DISCLAIMER NOTE: All improvements shown in <br />concept plants are subject to further evaluation. <br />Ru+A <br />3916 Normal Sl <br />San Diego, CA 92103 <br />City of Santa Ana <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />Conceptual Site Plan <br />17th St from Ross St to Broadway <br />Scale: 1" = 50'-0" <br />Ql <br />January 2024 <br />Santa Ana Vision Zero Plan <br />DRAFT <br />Figure 6-11:17th Street from Ross Street to Broadway Recommendations <br />SANTAANA VISION ZERO PLAN 119 <br />