Laserfiche WebLink
RECOMMENDED ENGINEERING IMPROVEMENTS <br />High Visibility Lane divider and/or mill 111 111 1 Bike Crossing <br />Markings Bike Lane Marking <br />Crosswalk c-curb divider <br />High Visibility School Road Striping - Multi -use Path Bike Sharrow Marking <br />Crosswalk <br />Conceptual Site Plan <br />Segerstrom Ave and Bear St <br />Scale: 1" = 40,_0„ <br />®3916KTU-AN <br />3916 Normal St <br />January 2024 <br />Santa Ana Vision Zero Plan <br />San Diego, CA92103 <br />� off) <br />Santa Ana <br />VISION ZERO <br />Note: All driveways with bike lanes or separated <br />bikeways to receive driveway treatments in the form <br />of `continuous sidewalks' or rubber humps. See <br />details page for more information. <br />Figure 6-21: Segerstrom Avenue and Bear Street Recommendations <br />SANTAANA VISION ZERO PLAN 139 <br />