Laserfiche WebLink
Santa Ana Vision Zero <br />Euclid St (Hazard Ave to McFadden <br />Ave) <br />MARK THOMAS <br />(Corridor Safety Enhancements including: Median Islands, Bike Lanes, <br />Bike Crossings, <br />Curb Extensions, Directional Curb Ramps and Protected Corners) <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)* <br />TOTAL CONSTRUCTION COST $ 8,230,000 <br />$ <br />10,010,000 <br />TOTAL RIGHT OF WAY COST $ 410,000 <br />$ <br />498,828 <br />TOTAL CAPITAL OUTLAY COSTS $ 8,640,000 <br />$ <br />10,509,000 <br />$ 1,080,000 <br />$ <br />1,320,000 <br />$ 1,520,000 <br />$ <br />1,850,000 <br />W <br />0 <br />RIGHT OF WAY (2%) <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made. <br />Appendix D <br />