Laserfiche WebLink
SANTAANA VISION ZERO PLAN <br />Santa Ana Vision Zero <br />Euclid St (Hazard Ave to McFadden Ave) <br />(Feasibility O inion of Probable Cost <br />\I <br />MARK THOMAS <br />ITEM No. <br />ITEM DESCRIPTION <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />TOTAL <br />ROADWAY <br />1 <br />Install Concrete - Curb Ramp <br />EA <br />57 <br />$ 8,000 <br />$456,000 <br />2 <br />Install Concrete - Median Curb <br />CY <br />281 <br />$ 1,230 <br />$345,630 <br />3 <br />Install Concrete - Curb and Gutter <br />CY <br />153 <br />$ 1,040 <br />$159,120 <br />4 <br />Install Concrete - Sidewalk <br />CY <br />293 <br />$ 850 <br />$249,050 <br />5 <br />Install Concrete - Textured Pavment <br />CY <br />69 <br />$ 890 <br />$61,410 <br />6 <br />Cold Plane <br />SQYD <br />47822 <br />$ 6 <br />$286,929 <br />7 <br />Roadway Excavation <br />CY <br />3773 <br />$ 110 <br />$415,030 <br />8 <br />Remove Concrete <br />CY <br />612 <br />$ 340 <br />$208,080 <br />9 <br />Hot Mix Asphalt <br />TON <br />11485 <br />$ 140 <br />$1,607,900 <br />10 <br />CI-2 Aggregate Base <br />CY <br />2186 <br />$ 130 <br />$284,180 <br />11 <br />Signing and Striping <br />LS <br />1 <br />$ 93,700 <br />$93,700 <br />12 <br />Centerline Hardening <br />EA <br />12 <br />$ 5,000 <br />$60,000 <br />13 <br />Landscape <br />SF <br />20174 <br />$ 8 <br />$161,392 <br />ELECTRICAL <br />14 <br />New Signal <br />EA <br />1 <br />$600,000 <br />$600,000 <br />SUBTOTALI <br />$4,988,421 <br />DRAINAGE <br />15 <br />IMinor Drainage <br />EA <br />1 12 <br />$20,000 <br />$240,000 <br />SUBTOTAL <br />$5,228,421 <br />16 <br />IMinor Items (10% of Items 1-15) * <br />LS <br />1 <br />$523,000 <br />$523,000 <br />SUBTOTAL <br />$5,751,421 <br />17 <br />IMobilization (10% of Items 1-16) <br />LS <br />1 <br />$576,000 <br />$576,000 <br />SUBTOTAL <br />$6,327,421 <br />CONTINGENCY (30%)" <br />$1,898,300 <br />CONSTRUCTION SUBTOTAL <br />$8,225,721 <br />GRAND TOTAL <br />CONSTRUCTION SUBTOTAL= <br />$8,225,721 <br />Right of Way/Temporary Construction Easement— `= <br />$410,000 <br />GRAND TOTAL= <br />$8,635,721 <br />Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />This feasibility level estimate includes a 30% contingency intended to compensate for the use of preliminary and limited information. <br />"' Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. <br />Utility improvements such as water, communication, gas, etc. are not included in these estimates. <br />Appendix D <br />