Laserfiche WebLink
Santa Ana Vision Zero <br />Greenville St (MacArthur Blvd to Warner Ave) <br />MARK THOMAS <br />(Corridor Safety Enhancements including: Median Islands, Class II/III/IV Bikeways, Bike Crossings, <br />Curb Extensions, Directional Curb Ramps, Railroad improvemnts and a Lane reduction) <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)* <br />TOTAL CONSTRUCTION COST $ 7,020,000 <br />$ <br />8,530,000 <br />TOTAL RIGHT OF WAY COST $ 390,000 <br />$ <br />474,495 <br />TOTAL CAPITAL OUTLAY COSTS $ 7,410,000 <br />$ <br />9,005,000 <br />$ 930,000 <br />$ <br />1,140,000 <br />LD <br />$ 1,300,000 <br />$ <br />1,590,000 <br />w <br />0 <br />RIGHT OF WAY (2%) <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made. <br />Appendix D <br />