Laserfiche WebLink
Santa Ana Vision Zero <br />\I <br />Main St (1st St to 17th SO <br />MARK THOMAS <br />(Corridor Safety Enhancements including: Median Islands, <br />Curb Extensions, and Directional Curb Ramps) <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)' <br />TOTAL CONSTRUCTION COST $ 4,890,000 <br />$ <br />5,950,000 <br />TOTAL RIGHT OF WAY COST $ 370,000 <br />$ <br />460,000 <br />TOTAL CAPITAL OUTLAY COSTS $ 5,260,000 <br />$ <br />6,410,000 <br />$ 660,000 <br />$ <br />810,000 <br />$ 930,000 <br />$ <br />1,140,000 <br />w <br />0 <br />RIGHT OF WAY (2%) <br />* Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were made. <br />Appendix D <br />