SANTAANA VISION ZERO PLAN <br />Santa Ana Vision Zero <br />Main St (1st St to 17th SO <br />(Feasibility O inion of Probable Cost <br />\I <br />MARK THOMAS <br />ITEM No. <br />ITEM DESCRIPTION <br />UNIT <br />QUANTITY <br />UNIT PRICE <br />TOTAL <br />ROADWAY <br />1 <br />Install Concrete - Curb Ramp <br />EA <br />72 <br />$ 8,000.00 <br />$576,000 <br />2 <br />Install Concrete - Median Curb <br />CY <br />119 <br />$ 1,230.00 <br />$146,370 <br />3 <br />Install Concrete - Curb and Gutter <br />CY <br />98 <br />$ 1,040.00 <br />$101,920 <br />4 <br />Install Concrete - Sidewalk <br />CY <br />152 <br />$ 850.00 <br />$129,200 <br />5 <br />Install Concrete - Textured Pavment <br />CY <br />102 <br />$ 890.00 <br />$90,780 <br />6 <br />Cold Plane <br />SQYD <br />35145 <br />$ 6 <br />$210,867 <br />7 <br />Roadway Excavation <br />CY <br />1771 <br />$ 110.00 <br />$194,810 <br />8 <br />Remove Concrete <br />CY <br />449 <br />$ 340.00 <br />$152,660 <br />9 <br />Hot Mix Asphalt <br />TON <br />8256 <br />$ 140.00 <br />$1,155,840 <br />10 <br />CL2 Aggregate Base <br />CY <br />1048 <br />$ 130.00 <br />$136,240 <br />11 <br />Signing and Striping <br />LS <br />1 <br />$ 79,700.00 <br />$79,700 <br />12 <br />Landscape <br />SF <br />8948 <br />$ 8.00 <br />$71,584 <br />DRAINAGE <br />13 <br />Tinor Drainage <br />EA <br />1 3 <br />$20,000 <br />$60,000 <br />SUBTOTAL <br />$3,105,971 <br />14 <br />Minor Items (10% of Items 1-13) * <br />LS <br />1 1 <br />$311,000 <br />$311,000 <br />SUBTOTAL <br />$3,416,971 <br />15 <br />Mobilization (10% of Items 1-14) <br />LS <br />1 1 <br />$342,000 <br />$342,000 <br />SUBTOTALI <br />$3,758,971 <br />CONTINGENCY(30%) ** <br />1 <br />$1,127,700 <br />CONSTRUCTION SUBTOTALI <br />$4,886,671 <br />GRAND <br />TOTAL <br />CONSTRUCTION SUBTOTAL= <br />$4,886,671 <br />Right of Way/Temporary Construction Easement***= <br />$370,000 <br />GRAND TOTAL= <br />$5,256,671 <br />Minor items (for example, fencing, signage, sidewalk repair, utility adjustments, etc.) have been estimated by using a percentage. <br />This feasibility level estimate includes a 30% contingency intended to compensate for the use of preliminary and limited information. <br />*** Right of way/TCE's for driveway closures, curb ramps, new signal equipment, conforms, etc. have been estimated at $10K/Location. <br />General Note: Where applicable, only minor drainage improvements for transportation projects to address safety are included. <br />Utility improvements such as water, communication, gas, etc. are not included in these estimates. <br />Appendix D <br />