My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:16:56 PM
Creation date
5/29/2024 6:15:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Pavement Network <br />• Non -Residential Street — Generally a low -speed two-lane, undivided roadway with <br />parking allowed on both sides of the street. Businesses are located on both sides of the <br />street. A non-residential street is designed to accommodate less than 6,000 vehicle trips <br />daily. This facility type comprises approximately 32 centerline miles or 10 percent of City <br />local network. <br />• Residential Street — Generally a low -speed and low -volume two-lane, undivided roadway <br />providing access to individual properties in a neighborhood. A residential street is <br />designed to accommodate less than 6,000 vehicle trips daily. This facility type comprises <br />approximately 285 centerline miles or 90 percent of City local network. <br />Figure 3-4: Local Street <br />City of Santa Ana 2024 Pavement Management Program 3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.