My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2024
>
06/04/2024
>
Item 33 - Measure M2 Funding Eligibility 2024 Renewal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2024 4:16:56 PM
Creation date
5/29/2024 6:15:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
33
Date
6/4/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Pavement Network <br />The sustainment in the condition of the local pavement network in recent years resulted largely <br />from the annual Local Street Preventative Maintenance Program, which commenced in 2014. <br />Figure 3-7 shows the current PCI distribution of the local network. <br />Figure 3-7: Current PCI Distribution (Local Network) <br />Current PCI Distribution (Local Network) <br />PGor, 7.1% <br />Fair, 50.7X <br />Goad, 243%_ <br />Very Poor, 5.9% <br />- Very Good - Good - Fair - Poor - Very Poor <br />Very Good, 45.3% <br />City of Santa Ana 2024 Pavement Management Program 3-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.