My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_It <br />Add separated <br />e O bikeway <br />�a :_0 <br />Add high vicontinentalcrosswalks top bar 5 ftbehinswalk <br />Add separated <br />bikeway - I <br />Add hardened centerline <br />in front of median <br />Add crossbikes <br />Add yellow reflective <br />border on signal heads <br />on all four approaches <br />Add separated <br />bikeway <br />WL,7_lz <br />Add bike -friendly bus stop based <br />on roadway and bikeway <br />configurations. See Section 6.1.9 <br />for available typologies. <br />Add curb refuge islands with truck <br />aprons at corners or curb . <br />extensions with directional <br />wheelchair ramps <br />111 <br />Rebuild raised median <br />RIF to be 2 feet wide to _)r <br />make room for bike <br />lanes <br />� 1 <br />Include bicycle/pedestrian 1 <br />friendly signal timing, such ` <br />as LPIs, if possible.�Ag/ <br />7- <br />Add separated , �, <br />bikeway <br />r DISCLAIMER NOTE: All <br />y • improvements shown in <br />concept plans are subject <br />^i'Mto further evaluation. <br />High Visibility Lane divider and/or Bike Crossing <br />Crosswalk c-curb divider Markings Bike Lane Marking <br />High Visibility School Road Striping Multi -use Path <br />Crosswalk p g Bike Sharrow Marking <br />Conceptual Site Plan <br />McFadden Ave and Harbor Blvd <br />Scale: 1" = 40'_0" <br />®KTU+A <br />3916 Normal St <br />January 2024 <br />Santa Ana Vision Zero Plan <br />San Diego, CA92103 <br />RECOMMENDED ENGINEERING IMPROVEMENTS <br />a a] <br />Santa Ana <br />VISION ZERO <br />Note: All driveways with bike lanes or separated <br />bikeways to receive driveway treatments in the form <br />of `continuous sidewalks' or rubber humps. See <br />details page for more information. <br />Figure 6-14: Harbor Boulevard and McFadden Avenue Recommendations <br />SANTAANA VISION ZERO PLAN 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.