My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Edinger Avenue and Maple Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Edinger Avenue and Maple Street is a unique offset intersection, <br />near the middle of the southeast quarter of the City, with Maple <br />Street northbound centerline shifted west 150 feet relative to the <br />southbound side of Maple Street. Another unique feature of the <br />intersection is a dedicated multi -use path that runs adjacent to the <br />southbound leg of Maple Street then runs north along a power line <br />easement between single family residential backyards. Land uses are <br />limited to single family residential. There are a total of five westbound <br />and eastbound vehicle lanes. North and southbound lanes on Maple <br />are small residential streets with limited local traffic. High traffic <br />volumes occur on the westbound and eastbound legs. Collision <br />rates are not high, but during the study period one severe injury has <br />occurred at the pedestrian crossing. A raised center median with <br />multi -use path and traffic signal is provided for people walking and <br />bicycling across Edinger Ave. Sidewalks, curb ramps, and bus stops <br />are provided on both sides of the street. No bicycle facilities are <br />provided on the westbound and eastbound legs on Edinger. Figure <br />6-16 shows recommended improvements that could be extended <br />farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />O yzN Q <br />r � <br />0 0 1 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Edinger Ave/Maple St <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 1,011,630 <br />$ <br />1,230,803 <br />TOTAL RIGHT OF WAY COST $ 50,000 <br />$ <br />60,833 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,062,000 <br />$ <br />1,292,000 <br />$ 140,000 <br />$ <br />180,000 <br />LD <br />$ 190,000 <br />$ <br />240,000 <br />RIGHT OF WAY (2%) <br />. Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />128 <br />
The URL can be used to link to this page
Your browser does not support the video tag.