My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-019 - Santa Ana Vision Zero Plan
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-019 - Santa Ana Vision Zero Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:36:53 PM
Creation date
6/13/2024 8:35:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-019
Item #
32
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. MacArthur Boulevard and Flower Street <br />Intersection Project <br />Existing Conditions and Recommendations <br />Flower Street and Macarthur Boulevard is a busy intersection at <br />the southeast corner of the City with single family residential at all <br />corners. Not counting turn lanes, there are six west -east vehicle lanes, <br />and five north -south through lanes. High traffic volumes has resulted <br />in a moderate level of collision rates and no recent fatalities or severe <br />injuries. Raised medians are provided on the busiest westbound <br />and eastbound legs of the intersection on MacArthur Boulevard. <br />Sidewalks, curb ramps, and bus stops are provided on both sides <br />of the street. No bicycle facilities are provided on the vehicle travel <br />lane. However, there is a multi -use path running north -south along <br />Flower Street and the channelized storm drain that starts north of the <br />intersection. Figure 6-17 shows recommended improvements that <br />could be extended farther along the route. <br />See Appendix D for a detailed breakdown of all cost estimates. <br />O f Q� <br />0 0 0 <br />Pedestrian Bicycle Vehicle <br />Serious Injuries and Fatalities between 2017-2021 <br />Project Location <br />Santa Ana Vision Zero <br />Flower St/MacArthur Blvd <br />(Feasibility Opinion of Probable Cost <br />SUMMARY OF PROJECT COST ESTIMATE <br />Current Year Cost <br />Escalated Cost (2028)" <br />TOTAL CONSTRUCTION COST $ 1,372,355 <br />$ <br />1,669,680 <br />TOTAL RIGHT OF WAY COST $ 40,000 <br />$ <br />48,666 <br />TOTAL CAPITAL OUTLAY COSTS $ 1,413,000 <br />$ <br />1,719,000 <br />$ 180,000 <br />$ <br />220,000 <br />LD <br />$ 250,000 <br />$ <br />310,000 <br />RIGHT OF WAY (2%) <br />Assumes escalation of 4% per year. No Adjustments in escalation for time between design and construction were <br />made. <br />130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.