My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-020 - Pavement Managmenet Plan for Measure M2 Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:44:53 PM
Creation date
6/13/2024 11:42:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-020
Item #
33
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.0 Maintenance And Rehabilitation Strategies <br />4.3.1 EXISTING FUNDING <br />This alternative represents the impacts of the City's current CIP budget on the entire pavement <br />network, and the arterial and local pavement networks independently, for the next seven years. <br />Currently, there are approximately $86.9 million and $51.3 million for the pavement expenditures <br />in the arterial and local networks, respectively, for the next seven years. The City's main objective <br />is keeping street sections from falling into the reconstruction category ("Very Poor" condition), at <br />which point typically costs three to four times more per SF than resurfacing. Therefore, the <br />selection of streets for M&R treatments during each fiscal year involves StreetSaver output, <br />engineering judgment and experience, and available budget. <br />With a limited existing budget over the next seven years from FY 2024/25 to FY 2030/31, the <br />entire pavement network will sustain within the "Good" condition by slightly deteriorating from a <br />PCl, , of 76.3 to a PCI,w of 75.2. Not only does the pavement condition deteriorate, but the entire <br />pavement network's backlog will increase by 59 percent by FY 2030/31 as shown in Table 4-3. <br />This information indicates that the City is facing the challenge of securing adequate, sustainable <br />funding for the M&R program to keep up with the increasing rate of deteriorating streets. <br />Although the arterial and local networks, independently, will reduce the PCI,w by at least one point <br />during each of the next seven FYs with the existing budgeted funding as compared to the baseline <br />alternative (without any funding), the pavement will deteriorate in a similar fashion to the entire <br />pavement network. Furthermore, the local and arterial networks will remain in "Good" condition. <br />Additionally, the current level of funding is insufficient to stabilize the backlog since the unfunded <br />deferred M&R projects will increase by 25 percent for the arterial network, increase by 34 percent <br />for the local network by FY 2030/31 and 59% for the entire network. <br />City of Santa Ana 2024 Pavement Management Program 4-4-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.