Laserfiche WebLink
May 27, 2024 <br />Mr. David Ramirez <br />CITY OF SANTA ANA <br />20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />Subject: City of Santa Ana — OCTA Pavement Management Compliance Report 2024 <br />Dear David: <br />As part of the 2024 Update of the Pavement Management Plan (PMP) for the City of Santa Ana, eucknam <br />Infrastructure Group, Inc. is pleased to submit the PMP reporting required by the Orange County <br />Transportation Authority (OCTA). This data/report will be submitted to OCTA as part of the City's required <br />biennial PMP prior to June 30, 2024. <br />The information contained in this report was used to develop the recommended improvement program for <br />the pavement network. The report covers the following categories: <br />• Pavement Management Plan Certification <br />• Quality Assurance / Quality Control (QA/QC) Plan <br />• Pavement Management Data Files (Included within the online Santa Ana StreetSaver batch file) <br />• Pavement Management Plan that includes the following: <br />• Average Pavement Conditions For Each Segment in the Network (PCI Report) <br />The Pavement Condition Index report shows the present condition of each street in <br />the pavement network (MPAH and Locals). In addition, the report shows the basic <br />geometry of each street segment. <br />• Seven-year Projected PCI Under Existing Funding Levels <br />This report identifies the projected PCI's based on the local agencies current funding <br />programs. This report details the PCI projects for the entire network, MPAH roadways <br />and Local streets. <br />• Seven-year Plan for Road Maintenance and Rehabilitation (Forecasted Maintenance <br />Report) <br />The Forecasted Maintenance Report projects the street maintenance activities <br />required for the next seven years, broken down to show maintenance levels for all <br />streets. This includes all scheduled projects provided by the City for fiscal years 2024 <br />through 2031. <br />