My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-020 - Pavement Managment Plan for Measure M2 Program
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2024
>
2024-020 - Pavement Managment Plan for Measure M2 Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2024 1:44:53 PM
Creation date
6/13/2024 11:42:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Agency
Clerk of the Council
Doc #
2024-020
Item #
33
Date
6/4/2024
Destruction Year
P
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Alternative Funding Levels <br />OCTA has requested two reports indicating the necessary funding to maintain the <br />City's current weighted average PCI as well as the necessary funding to improve the <br />weighted average PCI by one PCI point over the next seven years. <br />• Backlog by Fiscal Year (re: unfunded restoration, rehabilitation and reconstruction) <br />• Percentage of total network in each of the five condition categories based on centerline <br />mileage <br />• Local Match Reduction Reporting <br />In order to be eligible for Local Match Reduction of 10%, the following must be <br />submitted: <br />o Measurable improvement of paved road conditions during the previous <br />reporting period defined as an overall weighted (by area) average system <br />improvement of one PCI point. <br />o No reduction in the overall weighted (by area) average PCI in the MPAH <br />or local street categories <br />-or— <br />o Have road pavement conditions, for the overall network, during the <br />previous reporting period within the highest twenty (20%) of the scale for <br />road pavement conditions in conformance with OCTA Ordinance No. 3, <br />defined as a PCI of 75 or higher, otherwise defined as in "good condition". <br />These reports will be submitted to the City of Santa Ana as part of the biennial Pavement Management Plan <br />that is due prior to June 30, 2024. These reports will be packaged in a way that it will be easy for staff to review. <br />All comments received from the City have been incorporated in the reports that follow. All of the City's issues <br />and needs that were brought to our attention are included in the report. It has been a pleasure working with <br />you and the City on updating your Pavement Management Plan. We look forward to the continued success of <br />this project and future teamwork with City staff. <br />Sincerely, <br />Bucknam Infrastructure Group, Inc. <br />A � � <br />Peter J. Bucknam <br />Project Manager <br />Infrastructure Management — GIS Services <br />A <br />BUCKNAM <br />35485eandr <br />OceaseCA920 <br />AW INFRASTRUCTUREGROUP, INC <br />T ( <br />wwbuckna}-narrrinc.co 9 <br />nc�com <br />
The URL can be used to link to this page
Your browser does not support the video tag.