Laserfiche WebLink
SECTION E: RELEVANT PROJECT EXPERIENCE <br /> Project:Burwood and Figueroa Street and Stormdrain <br /> Owner: City of Los Angele <br /> Contact Information:TK Lee, 213-485-4528 <br /> Total Value: <br /> Completion Date: 8/04/2023 <br /> Description: Install City Stormdrain Facilities,Reconstruct asphalt roadway and concrete curb,gutter and <br /> sidewalk. <br /> Project:Arroyo Seco Low Flow Diversion Structure and Via Marisol Street Reconstruction <br /> Owner: City of Los Angeles <br /> Contact Information: Naushin Kamal 213-847-0342 <br /> Total Value: <br /> Completion Date: 12/20/2023 <br /> Description: Install stormdrain structure and reconstruct asphalt roadway,concrete curb and gutter <br /> Project: ESR—NCOS Jefferson Holdrege Vault Rehab <br /> Owner:City of Los Angeles <br /> Contact Information:Stephen Chao, 213-485-1626 <br /> Total Value: <br /> Completion Date: 10/15/2023 <br /> Description: Refurbish concrete vault with subsurface grouting design/build structural wall, replace 36- <br /> inch RCP ventilation line, remove and replace 8'CMU wall concrete curb and gutter <br /> Project: Crescent Drive Bulkhead <br /> Owner:City of Los Angeles <br /> Contact Information: Michael Womack 213-847-0494 <br /> Total Value: <br /> Completion Date: 12/09/2023 <br /> Description:Construct structural bulkhead 10-foot wall with 20 foot I beam caissons. Construct city <br /> roadway with curb and gutter <br /> Project:Vista Del Mar Slope Stabilization <br /> Owner:City of Los Angele <br /> Contact Information: Daniel Orris 213-847-0488 <br /> Total Value: <br /> Completion Date:8/14/2023 <br /> Description: Install stepped slope stabilization "Pipe and Board"Retaining walls. Reconstruct roadway <br /> following slope failure. <br /> 11 <br />