My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE PRLICH & SONS, INC.
Clerk
>
Contracts / Agreements
>
M
>
MIKE PRLICH & SONS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:32:45 AM
Creation date
6/18/2024 10:32:41 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE PRLICH & SONS, INC.
Contract #
A-2024-069-02
Agency
Public Works
Council Approval Date
5/21/2024
Expiration Date
5/20/2027
Insurance Exp Date
8/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION F: REFERENCES <br /> Project:On-Call Services Agreement <br /> Owner:City of Newport Beach <br /> Contact Information:Josh Rosenbaum 949-644-3057 <br /> Total Value: $500,000.00 <br /> Completion Date: On-Going <br /> Description:storm drain piping, catch basins,excavation of trenches,grading,Tide valves and structures. <br /> Project:On-Call Emergency or Immediate Construction and Maintenance Services <br /> Owner:South Coast Water District <br /> Contact Information: Megan Geer-949-499-4555 ext.3134 <br /> Total Value: $100,000/fy <br /> Completion Date: On-Going <br /> Description: Maintenance and Repair of all District Facilities <br /> Project: Emergency On-Call Geotechnical/Structural Construction Service <br /> Owner:City of Los Angeles <br /> Contact Information: Patrick Schmidt 213-847-0492 <br /> Total Value:500,000/per C.O. <br /> Completion On-Going(2024-2029) <br /> Description: In addition to/construction of bulkheads,retaining walls,slope stabilization,street repair, <br /> traffic control.Sidewalk and curb ramps,other public work construction per City Standard Plans <br /> Project:City of Los Angeles—Emergency Sewer/Storm Drain Response <br /> Owner:City of Los Angeles <br /> Contact Information: Bill Benson—Chief Construction Inspector 213-440-9138 <br /> Total Value: 3 million plus <br /> Completion Date: On-Going(2023-2028) <br /> Description:As needed emergency—Sewer&Storm Drains <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.