Laserfiche WebLink
City of Santa Ana <br /> ON-CALL EMERGENCY ASPHALT CONCRETE,CONCRETE,STOMDRAIN REPAIR SERVICES <br /> Mike Prllch and Sons,Inc. <br /> Labor Rates w/20%mark-up <br /> CRAFT TIME 2024 Rate 2025 Rate 2026 Rate <br /> Laborer App.6 ST $ 74.00 $ '•`'77.00 .$ -81,00 <br /> OT $ ':102.00 $ 107.00 '$ 112.00 <br /> DT '11$ 129,00 $):135.00 $ '141.00 <br /> Laborer Grp.4 ST $ "'=99.00: $ '103,00 $ 108,00 <br /> OT $ 133.00 $ 139,00. $.-`145.00 <br /> DT :$ 166.00 $<173.00 $ "`180,00. <br /> Teamster Grp.5 ST $`:11100. $` 116.00 $'1.-".121.00 <br /> OT $.1:`147.00 $1`153.00 $ '160.00 <br /> DT $i°182,00. $'='190.00 $i.i`:198.00 <br /> Operator Eng.Grp.8 ST $%15126.50 $`-''132,00. $"'138,00 <br /> OT $'`•171.00 $'r178.00 $ 186.00 <br /> DT $ 215,0.0. $11224.00 $ 233.00. <br /> Foreman ST $.::-1174.00 $ '1810O $`V:189.00 <br /> OT $1=228.00 $'.238.00 $ -24800. <br /> DT $''292.00. $.=304.00 $.1317,00- <br /> Project Manager ST $ 180.00 $ -188.00., $ 196,00 <br /> OT $ "235.00: $.: 245.00 $ "255.00. <br /> DT '$ :300.00. $ 312.00 $.`-1325.00 <br />