Laserfiche WebLink
City of Santa Ana-ON-CALL EMERGENCY ASPHALT CONCRETE,CONCRETE,AND STORMDMIN REPAIR SERVICES <br /> REP No.23-182 <br /> Fee Schedule Part 2-Major Task and Task Table <br /> NO. MAJOR TASK NO, SUB-TASK HOURLYEFFORT COST <br /> 1 Asphalt Concrete 1 Unclassified Excavation Removal of existing site work Labor Cost$5,500.00/Day <br /> Labor Crew:(1)foreman(I)operator(4)laborers Equipment cost$4,300/day <br /> Production Rate:100 SF/Day <br /> 2 Install AC Paving Grade and place base.Install AC Asphalt with Wearing Surface Labor Cost$7,50060/Day <br /> Labor Crew:(1)foreman(3)operator(5)laborers Equipment cost$6,400/day <br /> Production Rate:200 SF/day <br /> 3 Concrete Curb and Gutter Form and Place concrete flatwork Labor Cost$11,000.00/Day <br /> Labor Crew:(1)foreman(6)laborers Equipment cost$1,870/day <br /> Production Rate:200 LF/Day <br /> 2 Concrete Paving 1 Unclassified Excavation Removal of existing site work Labor Cost$5,50D.00/Day <br /> Labor Crew:(1)foreman(1)operator(6)laborers Equipment cost$4,300/day <br /> Production Rate:100 SF/Day 2 Install PCC Sidewalk Grade and place3"concrete sidewalk Labor Cost$11,000.00/Day <br /> Labor Crew:(1)foreman(6)laborers Equipment cost$1,870/day <br /> Production Rate:200 SF/day <br /> 3 Install FCC Curb Ramp Form and Place concrete access ramp Labor Cost$11,000.00/Day <br /> Labor Crew:(1)foreman(8)laborers Equipment cost$1,870/day <br /> Production Rate:100 SF/Day <br /> 4 Install PCC Curb and Gutter Form and Install PCC Curb and Gutter Labor Cost$11,000.00/Day <br /> Labor Crew:(1)foreman(6)lahoers Equipment cost$1,870 May <br /> Production Rate:250 LF/day <br /> 5 Build Catch Basin Form and construct Concrete Structure Labor Cost$9,500.00/Day <br /> Labor Crew:(1)foreman(4)laborers Equipment cost$1,50D/day <br /> Production Rate:1 EN 3 Days <br /> 3 Stormdrain 1 Unclassified Excavation Removal of existing site work Labor Cost$6,000,00/Day <br /> Labor Crew:(1)foreman(1)operator(4)laborers Equipment cost$5,000/day <br /> Production Rate:100SF/Day <br /> 2 Install AC Paving Install AC Paving over SD Trench Labor Cost$6,000.00/Day <br /> Labor Crew:(1)foreman(1)operator(4)laborers Equipment cost$5,000/day <br /> Production Rate:400 LF/day 3 Remove and Replace 18°C.M.P Excavate,place bedding,laypipe,backiillto below surf ace layer Labor Cost$6,000.00/Day <br /> (10 foot depth) Labor Crew:(1)foreman(4)laborers (1)operator Equipment cast$5,000/day <br /> Production Rate:80 LF/Day <br /> 4 Re move and Replace 18"R.C.P Excavate,place bedding,lay pipe,backfill to below surface layer Labor Cost$6,000.00/Day <br /> (10 foot depth) Labor Crew:(1)foreman(4)laborers (1)operator Equipment cost$5,000/day <br /> Production Rate:60 LF/Day <br /> 5 Remove and Replace 30"C.M.P Excavate,place bedding,lay pipe,backlit(to below surface layer Labor Cost$6,000,00/Day <br /> (201cot depth) Labor Crew:(1)foreman(4)laborers (1)operator Equipment cost$6,000/day Production Rate:60 LF/Day <br /> 6 Build Catch Basin Form and construct Concrete Structure Labor Cost$4,0110.00/Day <br /> Labor Crew:(1)foreman(4)laborers Equipment cost$2,000/day ' <br /> Production Rate:1 EA/3 Day <br />