My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MIKE PRLICH & SONS, INC.
Clerk
>
Contracts / Agreements
>
M
>
MIKE PRLICH & SONS, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2024 10:32:45 AM
Creation date
6/18/2024 10:32:41 AM
Metadata
Fields
Template:
Contracts
Company Name
MIKE PRLICH & SONS, INC.
Contract #
A-2024-069-02
Agency
Public Works
Council Approval Date
5/21/2024
Expiration Date
5/20/2027
Insurance Exp Date
8/1/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(-3..D <br /> Sample Task Order C—Stormdrain <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY i 50 *,02,•oo <br /> 2 AC Pavement 130 TN 2)50 sl5,ii,,o - <br /> 3 Remove&Replace 18"Corrugated Metal Pipe(CMP) 75 LF Z,0o0 ! 5'0,00 a <br /> 4 Remove&Replace 18"Reinforced Concrete Pipe(RCP) 75 LF 2,3 0 o 112,so0— <br /> 5 Remove&Replace 30"Reinforced Concrete Pipe(RCP) 75 LF L,S e'° i$7 55"— <br /> 6 Catch Basin(Type`B",W=10') 1 EA 35,000 35,0 00 <br /> 7 Traffic Control Work 1 LS 3-2-,0oo 2.2,oc — <br /> Sample Task Order D — Street Lighting <br /> Description Qty Unit Unit Price Total <br /> Furnish and Install Stre ' ht Pole 10 EA,--- <br /> Remove Existing Wooden Po e A <br /> Remove Existing Steel Pole __________________I <br /> EA <br /> Install Electrical Meter Pedestal 1 EA <br /> Install 2"PVC Conduit 4000 LF <br /> Install No. 5 Pull Box A <br /> Pothole Street Ligl ole Location • 10 EA _ <br /> Traffic Control Work 1 LS <br /> SURETY 1OND <br /> For each Task .der Issued by Public Works Agency, the Contractor shall provide cash deposit <br /> or surety"Paymenf' nd"Performance"bonds in the amounts specified by the"Greenbook"and <br /> City of Santa Ana upoh\\approval of the proposed itemised cost estimate for each approved on- <br /> call or emergency Task Orde�•which will be based upon the City's Standard Plans,As-Built Plans, <br /> or other direction from the Ph llic Works Agency. The cash deposit or the surety bonds shall <br /> guarantee the construction of all ecessary improvements for the Task Order, however, Bid <br /> Bonds shall not be required at tlie,time of the submittal of RFP Proposal. The City also <br /> reserves the right to retain 10% of pro • ess pay amounts for the one-year warranty work. The <br /> cash deposit shall be released approxima ' 135 days after all related permits and/or other <br /> \giapprovals required are signed off by the City onstruction Inspector, and the passage of any <br /> lien periods. In the event the work is not complete2l within one year of the date that a street work <br /> permit or Task Order is signed, applicant agrees that e City may apply the cash deposit to the <br /> • <br /> cost of completing the work and such work may be comp ed at the sole convenience of the City <br /> of Santa Ma. The deposit amount will be determined based uon the surface drainage and street <br /> improvement plans. <br /> City of Santa Ana RFP 23-182 <br /> Page Al-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.