Laserfiche WebLink
QUANTITIES FOR FEE SCHEDULE(UNDER SEPARATE COVER) <br /> For the purposes of providing a Fee Schedule based on the below Sample Task Orders, the <br /> following work items and quantities are provided. The Fee Schedule in Attachment 5: <br /> Each Fee Schedule shall include a schedule of the hourly billing rates for ALL contractor and <br /> subcontractor staff and labor personnel.Additionally,for each discipline that a company seeks to <br /> be considered, the below table(s) shall be completed. For example, if a General Contractor is <br /> submitting for Asphalt Concrete and Concrete Work, Sample Task Orders A and B would both <br /> be required to be completed as part of the Fee Schedule.Each table shall include the filling in of <br /> the last two columns for the relevant sample task orders for whichever category(ies) are being <br /> submitted for consideration. However, actual work will be paid for as described in Section I <br /> "Nature of Work."Sample Task Orders for Asphalt Concrete,Concrete Paving,Storrndrain,and t <br /> Street Lighting within the public right-of-way related work are,respectively: <br /> Sample Task Order A—Asphalt Concrete <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY 5 S p 30 z,Soo- <br /> 2 AC Pavement 130 TN 3 5c.0 '1-S S o'- <br /> 3 Furnish and Install#6 Pullbox 4 EA 2 ,a�03,0 o o"' <br /> 4 Adjust Manhole to Finished Grade 5 EA 1 19 o a q, coo- , <br /> 5 PCC Curb&Gutter(Type A-2-8) 100 LF 1 1 0 1-7.aoo- <br /> 6 Signing&Srtiping 1 LS -I, o v 7, ooJ <br /> 7 Traffic Control Work 1 LS t 5, a o g.p t c, 0 o c - <br /> i <br /> Sample Task Order B —Concrete Paving <br /> Item Description Qty Unit Unit Price Total <br /> 1 Unclassified Excavation 550 CY 5 50 3 07- goo <br /> 2 PCC Sidewalk(T=4") 2,500 SF • .t. c S,000 - <br /> 3 PCC Curb Ramp 3,000 SF `(— 1 3 S o00- _ <br /> 4 PCC Curb&Gutter(Type A-2-8) 100 LF 1 10 17, a ao <br /> 5 Furnish and Install#6 Pullbox 4 EA •..., oao S o a - <br /> 6 Adjust Manhole to Furnished Grade 5 EA ( )9 o c7 y 5-co <br /> 7 Catch Basin(Type`B",W=10') 1 EA 71 3,oc9u 3 5 OOP- <br /> 8 Remove and Replace 30"Reinforced Concrete 75 LF <br /> Pipe 2?o o -2_o 2,5 00 <br /> 9 Guard Rail Replacement(Caltrans RSP A77N4) 50 LF to oO 30,o oa - <br /> 10 Guard Rail Replacement(Caltrans) 1 EA '-)o, oo 0 3o,o00 <br /> 11 Remove and Replace Chain Link RJW Fence 50 LF 4- yo •zl ao o - <br /> 12 Concrete Barrier Type 83(Caltrans) 50 LF -1 .7...c� 3(0,0 0 0 <br /> 13 Traffic Control Work 1 LS 1 S poc !L3 oaQ' <br /> City of Santa Ana RFP 23-182 <br /> Page Al-2 <br />