My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Clerk
>
Contracts / Agreements
>
E
>
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:36:28 PM
Creation date
6/25/2024 8:32:26 AM
Metadata
Fields
Template:
Contracts
Company Name
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.)
Contract #
A-2023-194-03A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
9/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for CEQA Peer Review <br />April 2024 <br />new San Bernardino County Transportation Authority Arrow Passenger Rail line stations in the city. <br />The NSP sets regulations for the community's long-term vision for compact, efficient, and <br />environmentally sustainable development. As a form -based code, the NSP emphasizes building form, <br />mixed uses, strong pedestrian and transit -oriented development, and public realm improvements and <br />amenities. Technical studies EPD prepared include an air quality and GHG report; cultural and <br />paleontological resources report; energy analysis; noise impact analysis; VMT screening; and water <br />supply assessment. <br />Wood and Lurin Residential EIR — City of Riverside (Completed 2023) <br />EPD prepared an EIR for the City of Riverside for a residential development consisting of 96 single <br />family residential units on an 18.92-acre lot resulting in an overall density of 5.07 dwelling units per <br />acre. EPD prepared associated technical studies including Air Quality, GHG, Noise, Biological, Cultual <br />Resources and also helped the City conduct AB 52 consultations. EPD also prepared VMT Analysis for <br />the Project's significant and unavoidable VMT impacts. <br />Chase Road Residential — City of Fontana (Completed 2023) <br />EPD prepared a 15183 Streamlining Checklist for a residential development consisting of 48 single <br />family residential units, four of which would be affordable units set aside for very -low income <br />households. EPD also reviewed the associated technical studies and prepared both the Traffic Safety <br />Memo and VMT Screening Analysis Memo. <br />State Street Village SCEA — City of Redlands (Completed 2022) <br />EPD prepared the Sustainable Communities Environmental Assessment (SCEA) and provided CEQA <br />peer review for the technical studies for the State Street Village Project. The Project proposed to <br />demolish the existing buildings and develop six 3- to 4-story mixed -use buildings consisting of 700 <br />multifamily dwelling units, 71,778 square feet (SF) of ground -floor retail, 12,328 SF of office space, <br />amenity areas, community building, and a 1,721 SF rooftop restaurant space with a rooftop deck. A <br />14,500 SF drugstore with drive through and surface parking lot was proposed for the area south of <br />Citrus Avenue. The Project also included construction of an approximately 460-foot extension of West <br />State Street (west of Orange Street) to connect to a new 545-foot extension of Third Street through <br />the Project site. The SCEA tiered from the SCAG's Regional Transportation Plan/Sustainable <br />Communities Strategy (RTP/SCS) and provided CEQA clearance for this high -priority project for City <br />of Redlands. <br />Covina Bowl Mixed -Use Project — City of Covina (Completed 2027) <br />EPD prepared an EIR and supporting technical studies for the Covina Bowl Specific Plan, which <br />establishes a land use, development, and implementation framework for the enhancement and <br />redevelopment of a 7.5-acre site with a historic building within the western portion of the city of <br />Covina. The project consists of the implementation of a Specific Plan to establish a master -planned, <br />mixed -use development that includes a high -density residential community, as well as the adaptive <br />reuse of a historic bowling alley into approximately 12,000 square feet of commercial uses. In <br />addition, applications for a Tentative Tract Map and a site Plan Review are being filed with the City <br />to develop a 5.75-acre portion of the subject property with 113 3-bedroom, 3.5 bath attached <br />residential units and approximately 12,000 square feet of commercial space. <br />Tustin Housing Element and MND — City of Tustin (Completed 2022) <br />EPD provided Housing Element advisory services and assisted with the preparation of the City of <br />Tustin's Housing Element 6' Cycle Update and prepared the supporting Initial Study and Negative <br />Declaration. The Housing Element Update provided a plan to meet anticipated population growth <br />and housing needs, including incorporation of an additional 6,782 housing units to meet Regional <br />Housing Needs Allocation accommodating varying income distributions. EPD also assisted the City with <br />preparation and distribution of SB 18 and AB 52 tribal consultation letters. <br />Moiola Park Residences IS/MND — City of Fountain Valley (Completed 2027) <br />
The URL can be used to link to this page
Your browser does not support the video tag.