My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Clerk
>
Contracts / Agreements
>
E
>
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:36:28 PM
Creation date
6/25/2024 8:32:26 AM
Metadata
Fields
Template:
Contracts
Company Name
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.)
Contract #
A-2023-194-03A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
9/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for CEQA Peer Review <br />Aaril 2024 <br />C. Scope of Services <br />12 <br />EPD Solutions' peer review of the CEQA 15183 Exemption and associated technical studies will analyze <br />compliance with State CEQA Guidelines, applicable case law, and generally accepted professional <br />standards. We will also review the documents to confirm they are understandable to the average audience, <br />the mitigation measures are sufficient, clear and implementable. In addition, as part of this scope, DTA will <br />prepare a Fiscal Impact and Economic Benefit Analysis pursuant to City requirements. <br />Scope of Work Tasks <br />The following tasks are required to complete the peer review environmental documentation for the project. <br />In the sections that follow, more details are provided regarding how each task will be accomplished, which <br />team members will be responsible for each task, and the work products that will be produced. <br />Task 1: Peer Review of Technical Studies <br />Task 2: Peer Review of CEQA 15183 Exemption and CEQA Project Management <br />Task 3: Fiscal Impact Analysis <br />Task 4: Economic Impact Analysis <br />Task 5: Full Report of Fiscal Impact Analysis and Economic Impact Analysis (IF NEEDED) <br />Task 1 Peer Review of Technical Studies <br />Upon receipt of the Notice to Proceed, the EPD team will peer review each the technical reports prepared <br />by the Applicant's consultants for CEQA adequacy, sufficiency in covering its respective topic and City <br />Policies related to CEQA, is consistent with the project description and contains substantial evidence as <br />required by CEQA to support impact conclusions. EPD will also confirm each of the reports is ready for <br />incorporation into the CEQA 15183 Exemption. The peer review will include a thorough review of each study <br />focusing on background and existing conditions as compared with existing conditions viewed onsite during a <br />site visit, scope assumed, methodologies and General Plan EIR mitigation applied and impact conclusions. <br />Comments on each technical study will be made accordingly. <br />Although not identified in the RFP, the following technical studies are assumed to be provided to EPD via the <br />City in Microsoft Word and Adobe Acrobat PDF formats. <br />1. Air Quality & Greenhouse Gas Emissions <br />2. Geotechnical Report <br />3. Phase I Environmental Assessment Report (ESA) <br />4. Hydrology <br />5. Preliminary Water Quality Management Plan (WQMP) <br />6. Noise Study <br />7. Traffic Impact Analysis <br />8. VMT Screening Memo <br />EPD will coordinate the technical study comments with the City and if authorized, with the Applicant's <br />consultant team. EPD will provide one set of comments for the first review and all comments are assumed to <br />be addressed in the second review of the reports. Additional rounds of review would require an amendment <br />to this scope of work and proposed budget. <br />
The URL can be used to link to this page
Your browser does not support the video tag.