My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Clerk
>
Contracts / Agreements
>
E
>
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:36:28 PM
Creation date
6/25/2024 8:32:26 AM
Metadata
Fields
Template:
Contracts
Company Name
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.)
Contract #
A-2023-194-03A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
9/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for CEQA Peer Review <br />Aoril 2024 <br />Task 4. Economic Impact Analysis <br />fE <br />The EIA identifies the general economic impacts of the project and quantifies those impacts where possible. <br />General economic output impacts include additions to regional output (gross receipts or sales), earnings (the <br />sum of wages and salaries, proprietors' income, and other labor income), and employment (the number of <br />direct, indirect, and induced jobs created). <br />Task 4.1 - Recurring Job Creation <br />The non-residential land use components of the project will create new permanent recurring on -site jobs in <br />the City. These jobs are considered the direct employment impact of the project. In addition to direct recurring <br />employment, the project will generate recurring off -site jobs within the City, which are the indirect and <br />induced employment impacts of the project. <br />Subtasks under this category include the following: <br />• DTA will estimate the number of new jobs created on -site by each component of the project in the <br />City and the County; and <br />• based on the number of new on -site jobs created, DTA shall calculate new indirect and induced <br />City and County employment based on the IMPLAN input/output modeling system as it applies to <br />the City and County. <br />Task 4.2 - Recurring Sales Impacts <br />Retail sales in the City will increase indirectly with the development of the project as a result of resident and <br />employee purchases made within the City. DTA will analyze the indirect retail sales generated from off -site <br />retail expenditures by residents and employees and the multiplier effect of that spending on the local and <br />regional economy. The multiplier effect will be estimated using data available from IMPLAN. <br />Task 4.3 - Recurring Economic Impacts <br />Based on the recurring employment impacts determined under Task 4.1, DTA shall determine the sum of the <br />wages and salaries associated with these recurring direct, indirect, and induced jobs and the total economic <br />output associated with the project within the City. <br />Task 4.4 - One -Time Output, Wage, and Employment Impact <br />The project will generate one-time increases in output and wages within the City from the construction and <br />development of the project and all related site improvements. DTA will also estimate the number of off -site <br />jobs created in the City through indirect and induced impacts. Indirect and induced impacts represent the <br />multiplier effect of increases in wages and output on all sectors within the City's economy. <br />Task 4.5 - Jobs/Housing Ratio <br />This task includes calculating a Jobs/Housing Ratio as an indicator of the balance between employment and <br />housing opportunities for the project within the City. DTA will utilize U.S. Census data to create the current <br />ratio and determine the overall effect of new job creation on the Jobs/Housing Ratio. <br />Task 4.6 - Prepare Handout For EIA's Conclusions <br />DTA shall prepare a summary of the EIA's conclusions in the form of a handout suitable for submittal to and <br />review by the City. Should a full report be requested by the City, if needed Task 6 shall apply. <br />Task 5. Full Report of Fiscal Impact Analysis and Economic Impact Analysis (IF NEEDED) <br />Upon the City's request, DTA shall prepare a Full Report of the fiscal and economic impacts of the project, <br />plus numerous charts and tables, to be presented to the City with the model as an appendix. Please note <br />that DTA shall make minor revisions to the Full Reports after submittal to the City, such as grammatical, <br />calculation, and structural edits. However, any major revisions to the Full Report, including land use changes <br />or revised assumptions, will result in a change order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.