My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Clerk
>
Contracts / Agreements
>
E
>
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.) (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2024 10:09:36 AM
Creation date
6/25/2024 8:32:26 AM
Metadata
Fields
Template:
Contracts
Company Name
EPD SOLUTIONS, INC. (ENVIRONMENTAL PLANNING DEVELOPMENT SOLUTIONS, INC.)
Contract #
A-2023-194-03A
Agency
Planning & Building
Council Approval Date
11/7/2023
Expiration Date
11/7/2028
Insurance Exp Date
9/30/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for CEQA Peer Review <br /> April 2024 Page 15 <br /> Task 4. Economic Impact Analysis <br /> The EIA identifies the general economic impacts of the project and quantifies those impacts where possible. <br /> General economic output impacts include additions to regional output (gross receipts or sales),earnings (the <br /> sum of wages and salaries, proprietors' income, and other labor income), and employment (the number of <br /> direct,indirect,and induced jobs created). <br /> Task 4.1 - Recurring Job Creation <br /> The non-residential land use components of the project will create new permanent recurring on-site jobs in <br /> the City.These jobs are considered the direct employment impact of the project.In addition to direct recurring <br /> employment, the project will generate recurring off-site jobs within the City, which are the indirect and <br /> induced employment impacts of the project. <br /> Subtasks under this category include the following: <br /> • DTA will estimate the number of new jobs created on-site by each component of the project in the <br /> City and the County; and <br /> • based on the number of new on-site jobs created, DTA shall calculate new indirect and induced <br /> City and County employment based on the IMPLAN input/output modeling system as it applies to <br /> the City and County. <br /> Task 4.2- Recurring Sales Impacts <br /> Retail sales in the City will increase indirectly with the development of the project as a result of resident and <br /> employee purchases made within the City. DTA will analyze the indirect retail sales generated from off-site <br /> retail expenditures by residents and employees and the multiplier effect of that spending on the local and <br /> regional economy. The multiplier effect will be estimated using data available from IMPLAN. <br /> Task 4.3 -Recurring Economic Impacts <br /> Based on the recurring employment impacts determined under Task 4.1, DTA shall determine the sum of the <br /> wages and salaries associated with these recurring direct,indirect,and induced jobs and the total economic <br /> output associated with the project within the City. <br /> Task 4.4-One-Time Output, Wage,and Employment Impact <br /> The project will generate one-time increases in output and wages within the City from the construction and <br /> development of the project and all related site improvements. DTA will also estimate the number of off-site <br /> jobs created in the City through indirect and induced impacts. Indirect and induced impacts represent the <br /> multiplier effect of increases in wages and output on all sectors within the City's economy. <br /> Task 4.5 -Jobs/Housing Ratio <br /> This task includes calculating a Jobs/Housing Ratio as an indicator of the balance between employment and <br /> housing opportunities for the project within the City. DTA will utilize U.S. Census data to create the current <br /> ratio and determine the overall effect of new job creation on the Jobs/Housing Ratio. <br /> Task 4.6- Prepare Handout For EIA's Conclusions <br /> DTA shall prepare a summary of the EIA's conclusions in the form of a handout suitable for submittal to and <br /> review by the City. Should a full report be requested by the City, if needed Task 6 shall apply. <br /> Task 5. Full Report of Fiscal Impact Analysis and Economic Impact Analysis (IF NEEDED) <br /> Upon the City's request, DTA shall prepare a Full Report of the fiscal and economic impacts of the project, <br /> plus numerous charts and tables, to be presented to the City with the model as an appendix. Please note <br /> that DTA shall make minor revisions to the Full Reports after submittal to the City, such as grammatical, <br /> calculation, and structural edits. However,any major revisions to the Full Report, including land use changes <br /> or revised assumptions,will result in a change order. <br />
The URL can be used to link to this page
Your browser does not support the video tag.