My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
YUNEX TRAFFIC (YUNEX, LLC)
Clerk
>
Contracts / Agreements
>
Y
>
YUNEX TRAFFIC (YUNEX, LLC)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2024 12:28:19 PM
Creation date
7/1/2024 12:21:45 PM
Metadata
Fields
Template:
Contracts
Company Name
YUNEX TRAFFIC (YUNEX, LLC)
Contract #
A-2024-082
Agency
Public Works
Council Approval Date
6/4/2024
Expiration Date
7/1/2027
Insurance Exp Date
6/30/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(d) Speed Feedback Signs: <br /> (i) Maintenance period: <br /> The Contractor shall perform a complete inspection and service of each Speed <br /> Feedback Sign once every three(3)months for proper operation and cleanliness. <br /> (ii) Tasks: <br /> • Cabinets: <br /> The cabinets for solar powered speed feedback signs are small NEMA cabinet <br /> pole mounted at 9'-13'. <br /> The Contractor shall clean the cabinets thoroughly on the inside,including all <br /> components. The Contractor shall remove all unauthorized external <br /> attachments such as notices,posters, signs,etc. and notify the City of any <br /> graffiti that is on the signal equipment. It is not the Contractor's <br /> responsibility to remove the graffiti <br /> • Battery System: <br /> Contractor shall check system operating voltage and battery life. Notify the <br /> City if battery needs replacement. <br /> • Field Equipment <br /> The Contractor shall check LED display,poles, and standards. <br /> The contractor shall check and ensure that LED display, strobes,and radar <br /> detection equipment are in working order. <br /> Contractor shall check and notify the City of any missing or damaged traffic <br /> signs mounted on the traffic signal poles. <br /> Clean the solar panels in accordance to the manufacturer's recommendation. <br /> • Maintenance Record <br /> The Contractor shall maintain a record log in each controller cabinet showing <br /> the date and time of any service. It shall consist of: <br /> a. Routine Maintenance <br /> b. Extraordinary Maintenance <br /> All records shall be legibly written or printed. These record logs shall <br /> become property of the City. <br /> 2. Extraordinary Maintenance <br /> Extraordinary maintenance includes work tasks to install new,replace or repair defective <br /> or obsolete equipment and perform modification work not directly covered by routine <br /> maintenance. Work shall be performed with prior City approval unless emergency or <br /> public safety conditions require immediate response. <br /> City of Santa Ana RFP 24-046 <br /> Page Al-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.