Laserfiche WebLink
N <br /> Santa Ana:Traffic Signal and Streetlight Maintenance (RFP NO.: 24-046) "" <br /> TRAFFIC <br /> o Inspect electrical components (i.e., relays, load switches, equipment displays and <br /> indications, flasher(s), rack-mount detectors, harness/connectors, service <br /> connections, system telemetry, communications system, cabinet grounding, GFCI <br /> receptacles, terminal connections cabinet lights and switches, CMU (interlock) <br /> door switch, the police panel switches, etc.) for proper operation and adjust, as <br /> necessary. We will also verify proper operation of all equipment displays and <br /> cabinet/controller indicator lamps. Deficiencies that pose a safety concern will be <br /> corrected immediately. <br /> o Semi-annually verify that controller software/firmware is up to date. <br /> Following the visual inspection, your Yunex Traffic technician will examine the functionality <br /> of the controller in relation to traffic at the intersection and confirm all phase and <br /> coordination timing is programmed correctly and is current based on the timing sheet <br /> located in the controller cabinet. <br /> In addition to monitoring phase actuation from vehicle/traffic, they will also confirm proper <br /> intersection cycling by manually placing vehicle and pedestrian calls on each phase <br /> through the cabinet test switches or the controller keypad to verify controller servicing of <br /> each phase. <br /> Yunex Traffic technicians will ensure your controller's date and time is correct and we will <br /> adjust all controller clocks within 48 hours of time changes related to Daylight Savings <br /> Time. This also includes confirming the correct date and time in all Conflict Monitor Units <br /> and Malfunction Management Units (CMU/MMU) during each visit. <br /> Your Yunex Traffic technician will check the controller log buffers and investigate any <br /> faults that may have surfaced since the last maintenance visit. <br /> CMU's/MMU's can be tested annually or as requested. Technicians will be ATSI <br /> CMU/MMU Test Equipment Certified. Individual test results will meet the city's <br /> documentation requirements and be available in each controller cabinet and an electronic <br /> file (USB) will be delivered to the city within 30 days after completing the testing. This test <br /> will also be documented on the routine maintenance log located in the controller cabinet. <br /> If requested, the cost for annual CMU/MMU testing will be billed on a time/material basis. <br /> The technician will confirm all detector loop cables are correctly identified, connected to <br /> the correct vehicle detector field terminals, and that a call is placed on the correct detector <br /> input, and that the input places a call on the correct controller phase. We will adjust or re- <br /> tune detector amplifiers and correct substandard splices, as necessary. Loops requiring <br /> re-seal or replacement will be documented and reported to the city immediately. <br /> _ If the intersection is equipped with video/radar detection our technician will verify that <br /> detection zones are properly structured. They will also verify proper camera operation by <br /> monitoring the vehicle call on the video processor unit and confirm that the calls are <br /> registering in the controller and actuating the correct phase in the controller. The <br /> technician will verify that detection system software has been <br /> properly updated. Video Detection lens cleaning is included with Our technicians are <br /> Quarterly Routine Maintenance of Video Detection Systems. extremely knowledgeable <br /> If equipped, your Yunex Traffic technician will confirm operation with the installation, <br /> of all preemption devices (i.e., railroad, emergency vehicle handling, and testing of <br /> preemption (EVP),fire station preemption, etc.). EVP testing will interconnect and fiber <br /> be completed monthly and is included with routine monthly optic systems. <br /> maintenance. <br /> ©2024 Yunex Traffic 18 <br />